"Limestone Mining Project, Block- NB02" with Proposed Limestone Production Capacity- 0.6 MTPA & Waste- 0.03334 MTPA, Mine Lease Area- 8.6246 Ha by M/s Nuvoco Vistas Corporation Limited is a proposed mining project in Sinla, Jaitaran, Pali, Rajasthan. The site covers 21.3 acres.
Who is building it?
The applicant is Nuvoco Vistas Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Sinla, Jaitaran, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹2.7 crore and a site of 21.3 acres.
When was it filed?
The application was filed on 6 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Limestone Mining Project, Block- NB02" with Proposed Limestone Production Capacity- 0.6…
Project details
| Official title | "Limestone Mining Project, Block- NB02" with Proposed Limestone Production Capacity- 0.6 MTPA & Waste- 0.03334 MTPA, Mine Lease Area- 8.6246 Ha., at Near Village- Nimbol-Sinla, Tehsil- Jaitaran, District- Beawar (Rajasthan) by M/s Nuvoco Vistas Corporation Limited. |
|---|---|
| Status | More information requested |
| Status since | 2 Nov 2026 |
| Application filed | 6 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nuvoco Vistas Corporation Limited |
| Land area | 21.3 acres (8.6 ha) |
| Project cost | ₹2.7 crore |
| Village / locality | Sinla |
| Taluk / tehsil | Jaitaran |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-31975 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Oct 2026 (this page) | More information requested | 21.3 acres | ₹2.7 crore |
| Early planning filed 8 Jul 2025 | Cleared for impact study | 21.3 acres | ₹2.7 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 21.3 acres, this one is larger than 85% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 167.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 34 mining leases have applied within 5 km.
Where it is
Sinla, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Limestone Mining Project, Block- NB02" with Proposed Limestone Production… — cleared for impact study, 0 m away
- "Limestone Mining Project, Block- NB02" with Proposed Production Capacity- 0.6… — lapsed, 0 m away
- EC Re-appraisal of Existing Lime Stone Mining Lease (M.L. No. – 189/08 & Area:… — environmental approval granted, 300 m away
- "Limestone Mining Project, Block- NB01" with Proposed Limestone Production… — more information requested, 350 m away
- "Limestone Mining Project, Block- NB01" with Proposed Limestone Production… — cleared for impact study, 350 m away
- "Limestone Mining Project, Block- NB01" with Proposed Limestone Production… — lapsed, 350 m away
- "Nimbol Limestone Mine Block - NB 11" for capacity of 8,50,000 Tones/Year… — environmental approval granted, 400 m away
- "Nimbol Limestone Mine Block - NB 11" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 400 m away
More from Nuvoco Vistas Corporation Limited in Pali
- "Limestone Mining Project, Block- NB01" with Proposed Limestone Production… — more information requested
- "Limestone Mining Project, Block- NB03" with Proposed Limestone Production… — more information requested
- Green field project for fully mechanized Limestone opencast mine JMK-R2 Jhak… — cleared for impact study
- "Limestone Mining Project, Block- NB03" with Proposed Limestone Production… — cleared for impact study
- "Limestone Mining Project, Block- NB01" with Proposed Limestone Production… — cleared for impact study
- "Limestone Mining Project, Block- NB03" with Proposed Limestone Production… — lapsed
10 Nuvoco Vistas Corporation projects in Pali
All 24 Nuvoco Vistas Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.