Quick answers
What is this project?
"Limestone Mining Project, Block- NB03" with Proposed Limestone Production Capacity- 0.9 MTPA & Waste- 0.0231 MTPA, Mine Lease Area- 10.3417 Ha by M/s Nuvoco Vistas Corporation Limited is a proposed mining project in Bogasani, Jaitaran, Pali, Rajasthan. The site covers 25.6 acres.
Who is building it?
The applicant is Nuvoco Vistas Corporation Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Jul 2025), as of 27 Nov 2026.
Where is it?
In Bogasani, Jaitaran, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹2.8 crore and a site of 25.6 acres.
When was it filed?
The application was filed on 8 Jul 2025.
Project details
| Official title | "Limestone Mining Project, Block- NB03" with Proposed Limestone Production Capacity- 0.9 MTPA & Waste- 0.0231 MTPA, Mine Lease Area- 10.3417 Ha., at Near Village- Bogasani-Sinla, Tehsil- Jaitaran, District- Beawar (Rajasthan) by M/s Nuvoco Vistas Corporation Limited. |
|---|---|
| Status | Cleared for impact study |
| Status since | 11 Jul 2025 |
| Application filed | 8 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Nuvoco Vistas Corporation Limited |
| Land area | 25.6 acres (10.3 ha) |
| Project cost | ₹2.8 crore |
| Village / locality | Bogasani |
| Taluk / tehsil | Jaitaran |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27508 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Oct 2026 | More information requested | 25.6 acres | ₹2.8 crore |
| Early planning filed 8 Jul 2025 (this page) | Cleared for impact study | 25.6 acres | ₹2.8 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 25.6 acres, this one is larger than 86% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 218.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 32 mining leases have applied within 5 km.
Where it is
Bogasani, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Limestone Mining Project, Block- NB03" with Proposed Limestone Production… — more information requested, 0 m away
- "Limestone Mining Project, Block- NB03" with Proposed Limestone Production… — lapsed, 0 m away
- "Nimbol Limestone Mine Block - NB 11" for capacity of 8,50,000 Tones/Year… — environmental approval granted, 350 m away
- "Nimbol Limestone Mine Block - NB 11" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 350 m away
- "Nimbol Limestone Mine Block - NB 11" for capacity of 8,50,000 Tones/Year… — cleared for impact study, 350 m away
- Proposed "Nimbol Limestone Mine, Block- NB 04", for capacity of 12,00,000… — environmental approval granted, 500 m away
- "Nimbol Limestone Mine, Block- NB 04", for capacity of 12,00,000 Tones/Year… — withdrawn, 500 m away
- Proposed "Nimbol Limestone Mine, Block- NB 04", for capacity of 12,00,000… — cleared for impact study, 500 m away
More from Nuvoco Vistas Corporation Limited in Pali
- "Limestone Mining Project, Block- NB02" with Proposed Limestone Production… — more information requested
- "Limestone Mining Project, Block- NB01" with Proposed Limestone Production… — more information requested
- Green field project for fully mechanized Limestone opencast mine JMK-R2 Jhak… — cleared for impact study
- "Limestone Mining Project, Block- NB02" with Proposed Limestone Production… — cleared for impact study
- "Limestone Mining Project, Block- NB01" with Proposed Limestone Production… — cleared for impact study
- "Limestone Mining Project, Block- NB03" with Proposed Limestone Production… — lapsed
10 Nuvoco Vistas Corporation projects in Pali
All 24 Nuvoco Vistas Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.