Quick answers
What is this project?
Proposed River Bed Sand Mining Project for excavation of 2,02,788 TPA mineral from an area of 18.7767 Ha. bearing LOI reference no. SME/Kota-circle/ CC-I/JHALA/Bajri/Plot JWR 01/2024-25 dated 06.08.2024, Located at Plot No.- JWR 01 near revenue Village(s): Biriyakheri Khurd, Paroliya and Aaroliya of Tehsil- Jhalrapatan and Disctrict- Jhalawar, Rajasthan of Shree Balajee, of Lessee and Proprietor- Suresh Kumar Sehrawat is a proposed mining project in Aroliya, Pachpahar, Jhalawar, Rajasthan. The site covers 46.4 acres.
Who is building it?
The applicant is Suresh Kumar Sehrawat.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Apr 2025), as of 27 Nov 2026.
Where is it?
In Aroliya, Pachpahar, Jhalawar, Rajasthan.
How big is it?
It has a stated cost of ₹3 crore and a site of 46.4 acres.
When was it filed?
The application was filed on 4 Apr 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed River Bed Sand Mining Project for excavation of 2,02,788 TPA mineral from an…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Apr 2025 |
| Application filed | 4 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Suresh Kumar Sehrawat |
| Land area | 46.4 acres (18.8 ha) |
| Project cost | ₹3 crore |
| Village / locality | Aroliya |
| Taluk / tehsil | Pachpahar |
| District | Jhalawar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-28450 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Oct 2025 | Environmental approval granted | 46.4 acres | ₹3 crore |
| Amendment filed 25 Jun 2025 | Returned to applicant | 46.4 acres | ₹3 crore |
| Early planning filed 4 Apr 2025 (this page) | Cleared for impact study | 46.4 acres | ₹3 crore |
In context
140 applications in Jhalawar since January 2022 are in the same category (Mining): 91 approved, 22 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 46.4 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 39 have applied within 5 km.
Where it is
Aroliya, Pachpahar, Jhalawar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Kalisindh Power Project: An 800 MW Expansion in Jhalawar (7.8 km away).
Other projects nearby
- Proposed River Bed Sand Mining Project for excavation of 2,02,788 TPA mineral… — environmental approval granted, 0 m away
- Proposed River Bed Sand Mining Project for excavation of 2,02,788 TPA mineral… — returned to applicant, 0 m away
- M/s Uttam Stone Minerals Pvt.Ltd., Ref. No. 202410000107629 & M.L. no.… — cleared for impact study, 550 m away
- This is Proposed Lime Stone (Dimensional) Mining Project, Area 0.6329 Ha.… — cleared for impact study, 700 m away
- Cluster "Aroliya & Neharawad " Lime Stone (Dimensional) Mine, Ref… — environmental approval granted, 750 m away
- Re-appraisal of Environment Clearance granted by DEIAA to SEIAA in compliance… — environmental approval granted, 750 m away
- This is Proposed Lime Stone (Dimensional) Mining Project, Area- 1.5226 Ha.… — environmental approval granted, 850 m away
- This is Proposed Lime Stone (Dimensional) Mining Project, Area- 1.5226 Ha.… — cleared for impact study, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.