Quick answers
What is this project?
River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-47 Bajri Plot No.-23, Mining Lease Area- 91.3624 Ha, Proposed Production Capacity-3289046.40 TPA (ROM) {Saleable Mineral- 3289046.40 TPA & Waste- Nil, TPA} by Shri Bhupender Singh S/o Vidhyasagar Yadav is an approved mining project in Banthali, Duni, Tonk, Rajasthan. The site covers 225.8 acres.
Who is building it?
The applicant is Bhupender Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Dec 2025), as of 27 Nov 2026.
Where is it?
In Banthali, Duni, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹37 crore and a site of 225.8 acres.
When was it filed?
The application was filed on 5 Nov 2025.
Project details
| Official title | River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-47 Bajri Plot No.-23, Mining Lease Area- 91.3624 Ha, Proposed Production Capacity-3289046.40 TPA (ROM) {Saleable Mineral- 3289046.40 TPA & Waste- Nil, TPA} Located at Near Revenue Villages- Banthali Tehsil-Duni, District- Tonk, Rajasthan proposed by Shri Bhupender Singh S/o Vidhyasagar Yadav. |
|---|---|
| Status | Environmental approval granted |
| Status since | 12 Dec 2025 |
| Application filed | 5 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bhupender Singh |
| Land area | 225.8 acres (91.4 ha) |
| Project cost | ₹37 crore |
| Village / locality | Banthali |
| Taluk / tehsil | Duni |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-30854 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Nov 2025 (this page) | Environmental approval granted | 225.8 acres | ₹37 crore |
| Early planning filed 29 Apr 2025 | Cleared for impact study | 225.8 acres | ₹37 crore |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 225.8 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.
Where it is
Banthali, Duni, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-47 Bajri Plot… — cleared for impact study, 0 m away
- Amendment in ToR for Change in Proposed Production Capacity from 3348828 TPA… — cleared for impact study, 700 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.- BJ-48 Bajri Plot… — cleared for impact study, 700 m away
- Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot… — cleared for impact study, 800 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — environmental approval granted, 1.4 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — cleared for impact study, 1.4 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — withdrawn, 1.4 km away
- Environment Clearance for Mining of Bajri (Minor Mineral- River Sand) from the… — cleared for impact study, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.