Quick answers
What is this project?
River Sand (Bajri) Mining Project (Minor Mineral), Plot No.- BJ-48 Bajri Plot No.-24, Mining Lease Area- 93.023 Hectare, Proposed Production Capacity-3348828 TPA (ROM) {Saleable Mineral- 3348828 TPA & Waste- Nil, TPA} Located at Near Revenue Villages- Banthli, Tehsil-Dooni & District- Tonk (Rajasthan) proposed by Shree Kamakshi Transport Prop. Shri Mayank Garg S/o Shri Madan Lal Garg is a proposed mining project in Kunwarawas, Todaraisingh, Tonk, Rajasthan. The site covers 229.9 acres.
Who is building it?
The applicant is Mayank Garg.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Nov 2025), as of 27 Nov 2026.
Where is it?
In Kunwarawas, Todaraisingh, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹13 crore and a site of 229.9 acres.
When was it filed?
The application was filed on 18 Nov 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Nov 2025 |
| Application filed | 18 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mayank Garg |
| Land area | 229.9 acres (93 ha) |
| Project cost | ₹13 crore |
| Village / locality | Kunwarawas |
| Taluk / tehsil | Todaraisingh |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-31466 |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 229.9 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Kunwarawas, Todaraisingh, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in ToR for Change in Proposed Production Capacity from 3348828 TPA… — cleared for impact study, 0 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — environmental approval granted, 700 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — cleared for impact study, 700 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — withdrawn, 700 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-47 Bajri Plot… — environmental approval granted, 700 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-47 Bajri Plot… — cleared for impact study, 700 m away
- Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot… — cleared for impact study, 1.4 km away
- Environment Clearance for Mining of Bajri (Minor Mineral- River Sand) from the… — cleared for impact study, 2.1 km away
More from Mayank Garg in Tonk
- Amendment in ToR for Change in Proposed Production Capacity from 3348828 TPA… — cleared for impact study
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — lapsed
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No- BJ-51/2024, Bajri… — environmental approval granted
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — environmental approval granted
- Bajri(River Sand), Mining Project Plot No.- 56(Bajri Plot No. 16), Lease… — cleared for impact study
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No- BJ-51/2024, Bajri… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.