Environmental approval grantedBuildings & townships · Alwar, Rajasthan

Proposed Expansion of Two-Wheeler Manufacturing Plant at Plot no. SPL 2(A)-1, SPL 2(B)-1, SPL 2(C)-1, CFA-1, SPL-2(D), 2(E), 2(F) & 2(G), Tapukara Industrial Area, District - Khairthal-Tijara, Rajasthan by Honda Motorcycle and Scooter India Pvt. Ltd.

Proposed Expansion of Two-Wheeler Manufacturing Plant at Plot no. SPL 2(A)-1, SPL 2(B)-1, SPL 2(C)-1, CFA-1, SPL-2(D), 2(E), 2(F) & 2(G), Tapukara Industrial Area, District - Khairthal-Tijara, Rajasthan by Honda Motorcycle and Scooter India Pvt. Ltd is an approved industrial building project in Burerah, Tijara, Alwar, Rajasthan. It plans buildings of up to 3 floors on 77 acres. Its stated project cost is ₹3,785.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 6 Oct 2026).

See it on the live map All projects in Alwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since6 Oct 2026
Application filed21 Jul 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantHonda Motorcycle and Scooter India Private Limited
UseIndustrial
Floors (tallest)3
Parking spaces1,064
Land area77 acres (31.2 ha)
Built-up area1,24,877 m² (13,44,164 sq ft)
Plot area3,11,528 m² (33,53,256 sq ft)
Project cost₹3,785.5 crore
Village / localityBurerah
Taluk / tehsilTijara
DistrictAlwar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-32855

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 21 Jul 2026 (this page)Environmental approval granted77 acres₹3,785.5 crore
Early planning filed 31 Mar 2026Cleared for impact study77 acres₹3,785.5 crore

In context

114 applications in Alwar since January 2022 are in the same category (Buildings & townships): 44 approved, 46 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 77 acres, this one is larger than 85% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Burerah, Tijara, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Honda Motorcycle and Scooter projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.