Proposed Expansion of Two-Wheeler Manufacturing Plant at Plot no. SPL 2(A)-1, SPL 2(B)-1, SPL 2(C)-1, CFA-1, SPL-2(D), 2(E), 2(F) & 2(G), Tapukara Industrial Area, District - Khairthal-Tijara, Rajasthan by Honda Motorcycle and Scooter India Pvt. Ltd.

Proposed Expansion of Two-Wheeler Manufacturing Plant at Plot no. SPL 2(A)-1, SPL 2(B)-1, SPL 2(C)-1, CFA-1, SPL-2(D), 2(E), 2(F) & 2(G), Tapukara Industrial Area, District - Khairthal-Tijara, Rajasthan by Honda Motorcycle and Scooter India Pvt. Ltd is a proposed industrial building project in Burerah, Tijara, Alwar, Rajasthan. The site covers 77 acres. Its stated project cost is ₹3,785.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Jul 2026).

See it on the live map All projects in Alwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Two-Wheeler Manufacturing Plant at Plot no. SPL 2(A)-1, SPL…

Project details

StatusCleared for impact study
Status since29 Jul 2026
Application filed31 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantHonda Motorcycle and Scooter India Private Limited
UseIndustrial
Land area77 acres (31.2 ha)
Built-up area1,99,815 m² (21,50,789 sq ft)
Project cost₹3,785.5 crore
Village / localityBurerah
Taluk / tehsilTijara
DistrictAlwar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-33538

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 21 Jul 2026Environmental approval granted77 acres₹3,785.5 crore
Early planning filed 31 Mar 2026 (this page)Cleared for impact study77 acres₹3,785.5 crore

In context

114 applications in Alwar since January 2022 are in the same category (Buildings & townships): 44 approved, 46 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 77 acres, this one is larger than 85% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Burerah, Tijara, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Honda Motorcycle and Scooter projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.