What is Developing? Open the mapMap

Cleared for impact studyMining · Jaisalmer, Rajasthan

Joga-III Limestone Block (Area: 404.00 Ha) with proposed Limestone Production Capacity: 1.0 Million TPA, Waste: 0.572 Million TPA (Total Excavation: 1.572 Million TPA)

Joga-III Limestone Block (Area: 404.00 Ha) with proposed Limestone Production Capacity: 1.0 Million TPA, Waste: 0.572 Million TPA (Total Excavation: 1.572 Million TPA) is a proposed mining project in Joga, Jaisalmer, Rajasthan. The site covers 998.3 acres. Its stated project cost is ₹89 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Oct 2026).

See it on the live map All projects in Jaisalmer

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Joga-III Limestone Block (Area: 404.00 Ha) with proposed Limestone Production Capacity: 1.0 Million TPA, Waste: 0.572 Million TPA (Total Excavation: 1.572 Million TPA) is a proposed mining project in Joga, Jaisalmer, Rajasthan. The site covers 998.3 acres.

Who is building it?

The applicant is UltraTech Cement Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 Oct 2026), as of 27 Nov 2026.

Where is it?

In Joga, Jaisalmer, Rajasthan.

How big is it?

It has a stated cost of ₹89 crore and a site of 998.3 acres.

When was it filed?

The application was filed on 28 Aug 2026.

Project details

Official titleJoga-III Limestone Block (Area: 404.00 Ha) with proposed Limestone Production Capacity: 1.0 Million TPA, Waste: 0.572 Million TPA (Total Excavation: 1.572 Million TPA) along with installation of 1500 TPH Crusher with Wobbler & Screening by M/s. UltraTech Cement Limited located at Village: Joga, Tehsil: Ramgarh, District: Jaisalmer, Rajasthan.
StatusCleared for impact study
Status since31 Oct 2026
Application filed28 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUltraTech Cement Limited
Land area998.3 acres (404 ha)
Project cost₹89 crore
Village / localityJoga
Taluk / tehsilJaisalmer
DistrictJaisalmer
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-33046

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 14 Nov 2026Under environmental review998.3 acres₹89 crore
Amendment filed 14 Nov 2026Under environmental review998.3 acres₹89 crore
Early planning filed 28 Aug 2026 (this page)Cleared for impact study998.3 acres₹89 crore

In context

575 applications in Jaisalmer since January 2022 are in the same category (Mining): 231 approved, 103 filed or under review, and 241 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 998.3 acres, this one is larger than 95% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Joga, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from UltraTech Cement Limited in Jaisalmer

8 UltraTech Cement projects in Jaisalmer
All 182 UltraTech Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.