Quick answers
What is this project?
Tulsi Ram ki Dhani (TRD-II) Limestone Block (Area: 640.00 ha) with Proposed Limestone Production Capacity: 1.00 Million TPA, Topsoil: 0.008 Million TPA, Waste: 0.1 Million TPA (Total Excavation: 1.108 Million TPA) is a proposed mining project in Parewar, Jaisalmer, Rajasthan. The site covers 1,581.5 acres.
Who is building it?
The applicant is UltraTech Cement Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Parewar, Jaisalmer, Rajasthan.
How big is it?
It has a stated cost of ₹103 crore and a site of 1,581.5 acres.
When was it filed?
The application was filed on 2 Nov 2026.
Project details
| Official title | Tulsi Ram ki Dhani (TRD-II) Limestone Block (Area: 640.00 ha) with Proposed Limestone Production Capacity: 1.00 Million TPA, Topsoil: 0.008 Million TPA, Waste: 0.1 Million TPA (Total Excavation: 1.108 Million TPA) along with installation of 1500 TPH & 250 TPH capacity Crushers with Wobbler & Screening by M/s. UltraTech Cement Limited located at Villages: Parewar & Kabir basti (Gramdhani), Tehsil & District: Jaisalmer, Rajasthan. |
|---|---|
| Status | Under environmental review |
| Status since | 2 Nov 2026 |
| Application filed | 2 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 1,581.5 acres (640 ha) |
| Project cost | ₹103 crore |
| Village / locality | Parewar |
| Taluk / tehsil | Jaisalmer |
| District | Jaisalmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-37419 |
In context
575 applications in Jaisalmer since January 2022 are in the same category (Mining): 231 approved, 103 filed or under review, and 241 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1,581.5 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Parewar, Jaisalmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Parewar-A Limestone Block (ML Area: 400.00 ha) with Limestone… — lapsed, 2.4 km away
- Proposed Expansion of Parewar B Limestone Mine ( M.L. No. 08/2020, M.L. Area-… — more information requested, 3.3 km away
- Proposed Expansion of Parewar B Limestone Mine ( M.L. No. 08/2020, M.L. Area-… — under environmental review, 3.3 km away
- Re Appraisal of EC Granted from DEIAA, Jaisalmer, of "Silica Sand Mining… — lapsed, 4.8 km away
- Sub: Request for transfer of environmental clearance of Silica Sand Mining… — lapsed, 4.8 km away
- EC Re-Appraisal Parewar Silica Sand Mining Project (M.L. No. 306/2013), Area –… — environmental approval granted, 5.5 km away
- Parewar Silica Sand Mining Project (M.L. No. 306/2013), Area – 4.50 ha,… — lapsed, 5.5 km away
- Proposed Parewar SN1 Limestone Block (Area- 960 Ha.) with Total Excavation… — environmental approval granted, 5.6 km away
More from UltraTech Cement Limited in Jaisalmer
- Joga-III Limestone Block (Area: 404.00 Ha) with proposed Limestone Production… — under environmental review
- Joga-III Limestone Block (Area: 404.00 Ha) with proposed Limestone Production… — under environmental review
- Joga-I Limestone Block (Area: 384.00 Ha) with Proposed Limestone Production… — under environmental review
- Joga-I Limestone Block (Area: 384.00 Ha) with Proposed Limestone Production… — under environmental review
- Joga-III Limestone Block (Area: 404.00 Ha) with proposed Limestone Production… — cleared for impact study
- Joga-I Limestone Block (Area: 384.00 Ha) with Proposed Limestone Production… — cleared for impact study
8 UltraTech Cement projects in Jaisalmer
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.