Quick answers
What is this project?
Proposed Ball Clay, Silica Sand, Bajri, Murrum, Gravel & Kankar, Mining Project, Plot No.- 76/2024 & Area- 4.00 ha. located N/v– Indo Ka Bala, Tehsil- Kolayat, District- Bikaner (Rajasthan) By M/s Cipla Mines & Minerals (Prop. Smt. Kanupriya Mundhra W/o Shri Anirudh Mundhra) is a lapsed mining project in Inda Ka Bala, Kolayat, Bikaner, Rajasthan. The site covers 9.9 acres.
Who is building it?
The applicant is Kanupriya Mundhra.
Has it been approved?
No. The application was lapsed on 8 Apr 2026, so it is no longer under consideration.
Where is it?
In Inda Ka Bala, Kolayat, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 9.9 acres.
When was it filed?
The application was filed on 28 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Apr 2026 |
| Application filed | 28 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kanupriya Mundhra |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹2 crore |
| Village / locality | Inda Ka Bala |
| Taluk / tehsil | Kolayat |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33426 |
In context
516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 9.9 acres, this one is smaller than 56% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 29.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 46 mining leases have applied within 5 km.
Where it is
Inda Ka Bala, Kolayat, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ball Clay, Silica Sand, Bajri, Kankar, Gravel & Murrum Mining Project,… — cleared for impact study, 300 m away
- "Ball Clay, Silica Sand, Bajri, Kankar, Gravel & Murrum Mining Project,… — lapsed, 300 m away
- Proposed project of Ball Clay Silica Sand, Bajri, Gravel, Murrum & Kankar… — lapsed, 500 m away
- Proposed Ball Clay, Silica Sand, Bajri, Gravel Murrum & Kankar Mining Project,… — cleared for impact study, 650 m away
- Proposed Ball Clay, Silica Sand, Bajri, Gravel, Kankar & Murrum, Mining… — cleared for impact study, 800 m away
- "Ball Clay, Silica Sand, Bajri, Kankar, Gravel and Murrum Mining Project,… — cleared for impact study, 950 m away
- Enhancement of Production Capacity of Existing Indo Ka Bala Ball Clay, Fire… — under environmental review, 1.2 km away
- EC transfer Indo Ka Bala Ball Clay, Fire Clay, Red Yellow Ochere, Bajri And… — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.