Quick answers
What is this project?
Design,construction,maintenance and Operation of Processing Plant and Engineered Sanitary Landfill Site is a proposed waste management project in Chak 2 N W N, Hanumangarh, Rajasthan. The site covers 29.9 acres.
Who is building it?
The applicant is Allied Hanumangarh Ecogreens Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chak 2 N W N, Hanumangarh, Rajasthan.
How big is it?
It has a stated cost of ₹13.2 crore and a site of 29.9 acres.
When was it filed?
The application was filed on 23 Oct 2026.
Project details
| Official title | Design,construction,maintenance and Operation of Processing Plant and Engineered Sanitary Landfill Site Under the Guidlines of Sbm for Implementation of Solid Waste (Management & Handling) Rules, 2000 at Hanumangarh |
|---|---|
| Status | More information requested |
| Status since | 2 Nov 2026 |
| Application filed | 23 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Allied Hanumangarh Ecogreens Private Limited |
| Land area | 29.9 acres (12.1 ha) |
| Project cost | ₹13.2 crore |
| Village / locality | Chak 2 N W N |
| Taluk / tehsil | Hanumangarh |
| District | Hanumangarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-33913 |
Where it is
Chak 2 N W N, Hanumangarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Chemical Manufacturing Unit of Hydrazine Hydrate from… — cleared for impact study, 5.3 km away
- SPL ADDITIVES PVT.LTD. -Proposed Chemical Manufacturing Unit of Hydrazine… — environmental approval granted, 5.3 km away
- Proposed Expansion of Chemical Manufacturing Unit of Hydrazine Hydrate from… — environmental approval granted, 5.3 km away
- Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit by S S… — environmental approval granted, 5.5 km away
- Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit — environmental approval granted, 5.5 km away
- Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit — cleared for impact study, 5.5 km away
- Expansion of existing unit from 360 TPA to 720 TPA for manufacturing of… — lapsed, 5.7 km away
- Expansion of existing unit from 360 TPA to 720 TPA for manufacturing of… — cleared for impact study, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.