Quick answers
What is this project?
Sandstone (Minor Mineral) Mining Project with Production Capacity 2,36,925 TPA (ROM) (Sandstone- 1,42,155 TPA & Waste—94,770 TPA}, Plot No.-53, Area- 1.00 Ha., Khasra no. 543 and Total Cluster Area 6.0 Ha., Production Capacity 6,82,837 TPA by Shri Satyanarayan Prajapat is a proposed mining project in Kasti, Baori, Jodhpur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Satayanaryan Prajapat.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kasti, Baori, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 9 Mar 2026.
Project details
| Official title | Sandstone (Minor Mineral) Mining Project with Production Capacity 2,36,925 TPA (ROM) (Sandstone- 1,42,155 TPA & Waste—94,770 TPA}, Plot No.-53, Area- 1.00 Ha., Khasra no. 543 and Total Cluster Area 6.0 Ha., Production Capacity 6,82,837 TPA, Located at Near Village- Kasti, Tehsil– Bawari & Distt.–Jodhpur (Rajasthan) by Shri Satyanarayan Prajapat |
|---|---|
| Status | Under environmental review |
| Status since | 18 Nov 2026 |
| Application filed | 9 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Satayanaryan Prajapat |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Kasti |
| Taluk / tehsil | Baori |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-34381 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Mar 2026 (this page) | Under environmental review | 2.5 acres | ₹50 lakh |
| New project filed 24 Aug 2024 | Returned to applicant | 2.5 acres | ₹50 lakh |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.5 acres, this one is larger than 90% of them.
26 other mining leases have applied within 500 m of this site; together with this one they cover 66.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 174 mining leases have applied within 5 km.
Where it is
Kasti, Baori, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sandstone (Minor Mineral) Mining Project with Production Capacity 2,36,925 TPA… — lapsed, 0 m away
- Sandstone (Minor Mineral) Mining Project with Production Capacity 2,36,925 TPA… — returned to applicant, 0 m away
- Proposed Project of Sand Stone Mining Project (ML Area 1.00 ha and Plot No.-… — lapsed, 100 m away
- Shri Rameshwar Lal Ostwal, Sandstone (Minor Mineral) Mining Project with… — more information requested, 100 m away
- Proposed Project Sandstone Mining, Plot No. 55, area 1.0 hect Near Village… — cleared for impact study, 150 m away
- Proposed Sandstone Mining Project Plot No. 55, Area- 1.00 Ha, Near Village-… — lapsed, 150 m away
- Sandstone (Minor Mineral) Mining Project, Plot No.-49, Area- 1.00 Ha. with… — lapsed, 150 m away
- Shri Budh Singh. Sandstone (Minor Mineral) Mining Project with Production… — lapsed, 150 m away
More from Satayanaryan Prajapat in Jodhpur
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA… — more information requested
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA… — more information requested
- Sandstone (Minor Mineral) Mining Project Plot No.-48, Area- 1.00 Ha., Khasra… — lapsed
- Sandstone (Minor Mineral) Mining Project with Production Capacity 2,36,925 TPA… — lapsed
- Sandstone (Minor Mineral) Mining Project Plot No.-64, Area- 1.00 Ha., Khasra… — lapsed
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,69,065 TPA… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.