What is Developing? Open the mapMap

Under environmental reviewMining · Sawai Madhopur, Rajasthan

"Masonry Stone Short-Term Permit (STP) Mining Project, Reference No. 202610000145199" located at Khasra No.- 2259, Near village - Shayaroli, Tehsil- Wajirpur, District- Sawai Madhopur, Rajasthan with Proposed production of 2,00,000 MT in the name of M/s Dilip Buildcon Ltd. Ramky Consortium

"Masonry Stone Short-Term Permit (STP) Mining Project, Reference No. 202610000145199" located at Khasra No.- 2259, Near village - Shayaroli, Tehsil- Wajirpur, District- Sawai Madhopur, Rajasthan with Proposed production of 2,00,000 MT in the name of M/s Dilip Buildcon Ltd. Ramky Consortium is a proposed mining project in Syaroli, Wazeerpur, Sawai Madhopur, Rajasthan. The site covers 1 acre. Its stated project cost is ₹22 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 20 Nov 2026).

See it on the live map All projects in Sawai Madhopur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Masonry Stone Short-Term Permit (STP) Mining Project, Reference No. 202610000145199" located at Khasra No.- 2259, Near village - Shayaroli, Tehsil- Wajirpur, District- Sawai Madhopur, Rajasthan with Proposed production of 2,00,000 MT in the name of M/s Dilip Buildcon Ltd. Ramky Consortium is a proposed mining project in Syaroli, Wazeerpur, Sawai Madhopur, Rajasthan. The site covers 1 acre.

Who is building it?

The applicant is M/S. Dilip Buildcon LTD..

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Syaroli, Wazeerpur, Sawai Madhopur, Rajasthan.

How big is it?

It has a stated cost of ₹22 lakh and a site of 1 acre.

When was it filed?

The application was filed on 28 Sept 2026.

Project details

StatusUnder environmental review
Status since20 Nov 2026
Application filed28 Sept 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantM/S. Dilip Buildcon LTD.
Land area3,900 m²
Project cost₹22 lakh
Village / localitySyaroli
Taluk / tehsilWazeerpur
DistrictSawai Madhopur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-35128

In context

235 applications in Sawai Madhopur since January 2022 are in the same category (Mining): 97 approved, 46 filed or under review, and 92 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 100% of them.

No other mining lease on record is within 500 m of this site; 77 have applied within 5 km.

Where it is

Syaroli, Wazeerpur, Sawai Madhopur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/S. Dilip Buildcon LTD. in Sawai Madhopur

4 Dilip Buildcon projects in Sawai Madhopur
All 45 Dilip Buildcon projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.