Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Nov 2024 |
| Application filed | 10 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 15.2 acres (6.2 ha) |
| Forest land | 10.2 acres (4.1 ha) |
| Project cost | ₹4.6 crore |
| Village / locality | Amarpura |
| Taluk / tehsil | Nagaur |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36435 |
In context
15 applications in Nagaur since January 2022 are in the same category (Roads & highways): 8 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3.4 years from filing to approval. At 15.2 acres, this one is smaller than 60% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amarpura, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sh. Darab Khan, Mineral-Masonry Stone, ML No.-113/2007 — environmental approval granted, 2.3 km away
- Integrated Cement Plant - Clinker: 2 x 3.5 Million TPA; Cement: 2 x 3.0… — under environmental review, 4.5 km away
- Approach Access for Indian Oil Corporation Limited Retail Outlet on… — forest land use approved, 5 km away
- Shri Ajay Jain, Lime Stone Mine, Ml No-119/07 — environmental approval granted, 6.2 km away
- Proposed Cement Plant With Clinker Production Capacity of 12.0 MTPA, Calcined… — environmental approval granted, 6.9 km away
- Proposed Cement Plant With Clinker Production Capacity of 12.0 MTPA, Calcined… — cleared for impact study, 6.9 km away
- Proposed Harima Limestone Block PSB06 (Auctioned Block) (Area 4.80 ha) with… — environmental approval granted, 7.1 km away
- Proposed Harima Limestone Block PSB06 (Auctioned Block) (Area 4.80 ha) with… — cleared for impact study, 7.1 km away
More from Ministry of Road Transport & Highways in Nagaur
- Windening of Nagaur-Bikaner Section on NH-62 in Distt - Nagaur in the State of… — under forest review
- Foot over Bridges (FOB) on left out portion of NH-65 near Baldev Ram Mirdha… — initial checks
- Nagaur Bypass (Balance Length) From Existing Km161+000 (Amarpura on NH-58) to… — more information requested
- Widening From Two Lane to Four Lane With Paved Shoulder From Km 180+500 to Km… — lapsed
- Consultancy Service for Preparation of Detail Engineering Report for the… — lapsed
- Flyover on NH-62 at km 213/600 Khimsar Villlage on Nagaur-Jodhpur Section in… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.