Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Jul 2025 |
| Application filed | 15 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 9.1 acres (3.7 ha) |
| Forest land | 10.2 acres (4.1 ha) |
| Project cost | ₹4.6 crore |
| Village / locality | Amarpura |
| Taluk / tehsil | Nagaur |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-35868 |
In context
15 applications in Nagaur since January 2022 are in the same category (Roads & highways): 8 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3.4 years from filing to approval. At 9.1 acres, this one is smaller than 87% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amarpura, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Shed for Spice processing unit having capacity 100 TPD… — environmental approval granted, 2.1 km away
- Foot over Bridges (FOB) on left out portion of NH-65 near Baldev Ram Mirdha… — initial checks, 5.1 km away
- Widening with Four lane with paved shoulder from Km.166.00 to 172.200 on Old… — forest land use approved, 5.1 km away
- Access Permission for Laying of Underground 350 Mm Dia Di Water Pipeline From… — forest land use approved, 6 km away
- Proposed Commercial Project "r3c Luxury Mall" (Gross Bua-37,948.31 Sq.M &… — lapsed, 6.5 km away
- Smt. Madhu Mirdha, Masonary Stone Mine, Ml No-47/2008 — lapsed, 7.7 km away
- Windening of Nagaur-Bikaner Section on NH-62 in Distt - Nagaur in the State of… — under forest review, 9 km away
- Bhadwasi Gypsum Mines, M.L. No-02/94, Total Lease Area- 1122.38 Ha., (Proposed… — more information requested, 9.5 km away
More from Ministry of Road Transport & Highways in Nagaur
- Windening of Nagaur-Bikaner Section on NH-62 in Distt - Nagaur in the State of… — under forest review
- Foot over Bridges (FOB) on left out portion of NH-65 near Baldev Ram Mirdha… — initial checks
- Nagaur Bypass (Balance Length) From Existing Km161+000 (Amarpura on NH-58) to… — more information requested
- Widening From Two Lane to Four Lane With Paved Shoulder From Km 180+500 to Km… — lapsed
- Detailed Project Report for Consultancy Services for Preparation of Detail… — lapsed
- Flyover on NH-62 at km 213/600 Khimsar Villlage on Nagaur-Jodhpur Section in… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.