Quick answers
What is Power Connection to Own Khatedari Land?
Power Connection to Own Khatedari Land is a proposed power project in Bandra, Gadraroad, Barmer, Rajasthan. The site covers 0.2 acres.
Who is building it?
The applicant is Amad Khan.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bandra, Gadraroad, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹446 crore and a site of 0.2 acres.
When was it filed?
The application was filed on 4 Jun 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 4 Jun 2023 |
| Application filed | 4 Jun 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Amad Khan |
| Land area | 1,000 m² |
| Project cost | ₹446 crore |
| Village / locality | Bandra |
| Taluk / tehsil | Gadraroad |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36945 |
In context
24 applications in Barmer since January 2022 are in the same category (Power): 8 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.2 acres, this one is smaller than 96% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bandra, Gadraroad, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mobile Tower installation by BSNL — more information requested, 3.9 km away
- Mobile Tower installation by BSNL — application filed, 3.9 km away
- BSNL Rajasthan-District Barmer-Village-Bikoosi-(86665) — decision issued, 4.2 km away
- BSNL Rajasthan-District Barmer-Village-Kundal@Godha-(86666)"in tehsil Gadra… — decision issued, 4.4 km away
- Power Connection to Own Khatedari Land in Dnp — more information requested, 5.6 km away
- Power Connection to Own Khatedari Land — more information requested, 9.4 km away
- Mobile Tower installation by BSNL — more information requested, 9.8 km away
- Mobile Tower installation by BSNL — application filed, 9.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.