Quick answers
What is Power Connection to Own Khatedari Land?
Power Connection to Own Khatedari Land is a proposed power project in Asari Sindhiyan, Gadraroad, Barmer, Rajasthan. The site covers 0.2 acres.
Who is building it?
The applicant is Sumer Singh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Asari Sindhiyan, Gadraroad, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹2 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 5 Mar 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 5 Mar 2025 |
| Application filed | 5 Mar 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Sumer Singh |
| Land area | 1,000 m² |
| Project cost | ₹2 lakh |
| Village / locality | Asari Sindhiyan |
| Taluk / tehsil | Gadraroad |
| District | Barmer |
| State | Rajasthan |
| Location from | Site area on record |
| Our reference | WID-RJ-37182 |
In context
24 applications in Barmer since January 2022 are in the same category (Power): 8 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.2 acres, this one is smaller than 96% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asari Sindhiyan, Gadraroad, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Power Connection to Own Khatedari Land in Dnp — more information requested, 3.9 km away
- Mobile Tower installation by BSNL — more information requested, 4.5 km away
- Mobile Tower installation by BSNL — application filed, 4.5 km away
- Power Connection to Own Khatedari Land — more information requested, 6.3 km away
- BSNL Rajasthan-District Barmer-Village-Kundal@Godha-(86666)"in tehsil Gadra… — decision issued, 9.3 km away
- Power Connection to Own Khatedari Land — more information requested, 9.4 km away
- Power Connection to Own Khatedari Land — application filed, 9.7 km away
- Mobile Tower installation by BSNL — more information requested, 10.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.