Quick answers
What is this project?
''Masonry Stone Mining Project, M.L. No: 9/2007'' having mine lease area 1.00 Hectare, Proposed Production capacity: 50,080 TPA (ROM), located at Khasra no. 61, near Village: Kotri, Tehsil: Kishangarh, District: Ajmer, Rajasthan, in the name of Sh. Jagdish Prasad S/o Sh. Nawala Ram Jat is a proposed mining project in Kotri, Roopangarh, Ajmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Jagdish Prasad Choudhary.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Kotri, Roopangarh, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹72 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 26 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 26 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jagdish Prasad Choudhary |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Kotri |
| Taluk / tehsil | Roopangarh |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-37589 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.
Where it is
Kotri, Roopangarh, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfar EC of "Masonry Stone Mining Project, ML No.-14/2007" with Production… — lapsed, 750 m away
- Transfar EC of "Masonry Stone Mining Project, ML No.-13/2007" with Production… — lapsed, 750 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — lapsed, 750 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — returned to applicant, 750 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — lapsed, 750 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — lapsed, 750 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — lapsed, 750 m away
- Parsa Ram Choudhary — environmental approval granted, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.