Quick answers
What is this project?
Diversion of additional forest land for construction of 12MW Rellichu HEP at Karjee, Tashiding, Geylshing District, by Power Deptt. GoS is an approved water and irrigation project in Gyalshing Forest Block, Gyalshing, West District, Sikkim. The site covers 4.9 acres.
Who is building it?
The applicant is Power Department.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 20 Apr 2026), as of 27 Nov 2026.
Where is it?
In Gyalshing Forest Block, Gyalshing, West District, Sikkim.
How big is it?
It has a stated cost of ₹68.6 crore; a site of 4.9 acres and 4.9 acres (2 ha) of forest land.
When was it filed?
The application was filed on 25 Mar 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 20 Apr 2026 |
| Application filed | 25 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Power Department |
| Land area | 4.9 acres (2 ha) |
| Forest land | 4.9 acres (2 ha) |
| Project cost | ₹68.6 crore |
| Village / locality | Gyalshing Forest Block |
| Taluk / tehsil | Gyalshing |
| District | West District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00040 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gyalshing Forest Block, Gyalshing, West District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land for Transmission line of Rellichu 12MW HEP from… — forest land use approved, 1.7 km away
- Rellichu-II HEP — forest land use approved, 2.1 km away
- Laying Ofc From Laso to Gyalshing Forest Block Through Forest Areas Along the… — lapsed, 9 km away
- Laying Ofc From Gyalshing to Laso Passing Through Forest Areas of Gyalshing… — lapsed, 11.1 km away
- Diversion of Forest Land for Laying of Ofc Cable of Garn-9038 Connecting… — lapsed, 11.9 km away
- Development of Tourist Amenities at Khechoperi Lake in West Sikkim — not approved, 12.3 km away
- Diversion of 0.15 Hac of forest land for construction of office complex or… — forest land use approved, 12.9 km away
- Diversion of 1.44 Ha of Forest Land for Const of Approach Road to Sewerage… — more information requested, 14.7 km away
More from Power Department in West District
- Diversion of forest land for Transmission line of Rellichu 12MW HEP from… — forest land use approved
All 16 Power Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.