Project details
| Status | Forest land use approved |
|---|---|
| Status since | 20 Apr 2026 |
| Application filed | 7 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Defense |
| Land area | 286.9 acres (116.1 ha) |
| Forest land | 286.9 acres (116.1 ha) |
| Project cost | ₹389.1 crore |
| Village / locality | Lachung Forest Block |
| Taluk / tehsil | Chungthang |
| District | North District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00086 |
In context
15 applications in North District since January 2022 are in the same category (Roads & highways): 3 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 286.9 acres, this one is larger than 92% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lachung Forest Block, Chungthang, North District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Divrsion of Forest Land for Extension of Power Supply to Broder Defence Area… — under forest review, 3.1 km away
- Widening of Existing Road (NH 310a) to Nhdl Specification With Paved Shoulder… — decision issued, 13.9 km away
- Diversion of Forest Land Measuring 3.30 Ha for Construction of Military… — initial checks, 16.2 km away
- Diversion of Forest Land of 1.05 Ha for Construction of Cho-Lung-Trul-Sum… — lapsed, 16.8 km away
- Diversion of Forest Land of 1.0940 Ha for Construction of Cho-Lung Trul-Sum… — lapsed, 21.1 km away
- Diversion of Forest land of 0.0929 ha for construction of Food Godown at… — forest land use approved, 21.6 km away
- Diversion of 0.00325 Ha of Forest Land for Construction of Skill Development… — more information requested, 21.6 km away
- Construction/Improvement on Epc Mode of Existing Road to Nhdl Specification… — lapsed, 21.7 km away
More from Ministry of Defense in North District
- Widening of Existing Road (NH 310a) to Nhdl Specification With Paved Shoulder… — decision issued
- DIVERSION OF FOREST LAND FOR IMPROVEMENT OF MANGAN-SANKLANG ROAD FROM CL-9 TO… — forest land use approved
- Diversion of Forest Land Required for Realignment Between Km 80.800 to Km… — lapsed
- Construction/Improvement on Epc Mode of Existing Road to Nhdl Specification… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.