Project details
| Status | Forest land use approved |
|---|---|
| Status since | 31 Jan 2024 |
| Application filed | 9 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Power Department |
| Land area | 7.2 acres (2.9 ha) |
| Forest land | 7.2 acres (2.9 ha) |
| Project cost | ₹91.4 crore |
| Village / locality | Tung |
| Taluk / tehsil | Chungthang |
| District | North District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00126 |
In context
12 applications in North District since January 2022 are in the same category (Water & irrigation): 9 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.2 acres, this one is smaller than 67% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tung, Chungthang, North District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land Required for Realignment Between Km 80.800 to Km… — lapsed, 300 m away
- Re-alignment of 2.79 ha of forest land for const of 10 MW New Meyong Chu HEP… — forest land use approved, 700 m away
- Diversion of 3.058 Ha of forest land for rehabilitation site for flashflood or… — not approved, 850 m away
- Diversion of 3.102 Ha of Forest Land for Rehabilitation Site for Flashflood Or… — not approved, 1.3 km away
- Chakung Chu HEP — cleared for impact study, 2.1 km away
- Diversion of forest land of 0.016 ha for construction of Plastic Waste… — more information requested, 2.2 km away
- Diversion of 2.5149 ha of forest land for construction of HEP (2x3=6 MW) on… — forest land use approved, 3.1 km away
- Diversion of 2.5149 ha of forest land for construction of HEP (2x3=6 MW) on… — lapsed, 3.1 km away
More from Power Department in North District
- Divrsion of Forest Land for Extension of Power Supply to Broder Defence Area… — under forest review
- Re-alignment of 2.79 ha of forest land for const of 10 MW New Meyong Chu HEP… — forest land use approved
- Diversion of 0.5252 ha of forest land for part construction of Rabom Chu HEP… — forest land use approved
- Diversion of 2.5149 ha of forest land for construction of HEP (2x3=6 MW) on… — forest land use approved
- Diversion of 2.5149 ha of forest land for construction of HEP (2x3=6 MW) on… — lapsed
6 Power Department projects in North District
All 16 Power Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.