Quick answers
What is this project?
Diversion of 0.6396 Ha of Forest Land (0.2429 Ha in Gangtok Division & 0.3967 Ha in Pakyong Division) for the Project "realignment of Nh-717a From Design Ch. 0.00 (Km 77.800 of NH-10) to Design Ch. 2.00 (Km 3.1 of Nh-717a) With Two Lane Paved Shoulder Including Major Bridge of 680m in the State of Sikkim on Epc Mode" is a proposed road project in Namli, Gangtok, East District, Sikkim. The site covers 1.2 acres.
Who is building it?
The applicant is Morth (Nhidcl).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Namli, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹61 crore; a site of 1.2 acres and 1.6 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 11 Nov 2022.
Project details
| Status | More information requested |
|---|---|
| Status since | 21 Sept 2026 |
| Application filed | 11 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Morth (Nhidcl) |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 1.6 acres (0.6 ha) |
| Project cost | ₹61 crore |
| Village / locality | Namli |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00176 |
In context
22 applications in East District since January 2022 are in the same category (Roads & highways): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 1.2 acres, this one is larger than 53% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Namli, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- OFC laying work from New Alternative Highway to Glenmark Company — lapsed, 850 m away
- Proposed Golden Jubelee State of the Art Convention Center, Sikkim — environmental approval granted, 900 m away
- Diversion of Forest Land for the Construction of Kanchendzonga… — lapsed, 900 m away
- Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction… — under forest review, 1.2 km away
- Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction… — lapsed, 1.2 km away
- Diversion of forest land of 0.0814 Ha for construction of 11KV HT line at… — more information requested, 1.7 km away
- Diversion of forest land for construction of Christian Burial land at Namli… — not approved, 1.9 km away
- 40m Span Steel Bridge Over Rani Khola and 25m Span Steel Bridge Over Hel Khola… — more information requested, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.