Quick answers
What is this project?
Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction of Water Tank From Seti Khola to Agricultural Engineering College in Ranipool, Gangtok District of Sikkim by College of Agricultural Engineering and Post Harvest Technology, Government of India is a lapsed water and irrigation project in Naitam, Gangtok, East District, Sikkim. The site covers 0.1 acres.
Who is building it?
The applicant is Department of Agriculture & Farmers Welfare.
Has it been approved?
No. The application was lapsed on 23 Jun 2026, so it is no longer under consideration.
Where is it?
In Naitam, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹11 lakh; a site of 0.1 acres and 390 m² of forest land.
When was it filed?
The application was filed on 26 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction of Water…
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Jun 2026 |
| Application filed | 26 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Department of Agriculture & Farmers Welfare |
| Land area | 400 m² |
| Forest land | 390 m² |
| Project cost | ₹11 lakh |
| Village / locality | Naitam |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00081 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jul 2026 | Under forest review | 0.1 acres | ₹11 lakh |
| New project filed 26 May 2025 (this page) | Lapsed | 0.1 acres | ₹11 lakh |
In context
14 applications in East District since January 2022 are in the same category (Water & irrigation): 2 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 64% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naitam, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction… — under forest review, 0 m away
- Diversion of 0.6396 Ha of Forest Land (0.2429 Ha in Gangtok Division & 0.3967… — more information requested, 1.2 km away
- OFC laying work from New Alternative Highway to Glenmark Company — lapsed, 1.4 km away
- Proposed Golden Jubelee State of the Art Convention Center, Sikkim — environmental approval granted, 1.9 km away
- Diversion of Forest Land for the Construction of Kanchendzonga… — lapsed, 2 km away
- Diversion of Forest Land for Laying of Ofc Cable of Gaok-Enb-0025 Connecting… — lapsed, 2.5 km away
- Diversion of 1.9763 Ha of forest land for "Drawing of New 66KV D/C… — more information requested, 2.7 km away
- Diversion of forest land of 0.0814 Ha for construction of 11KV HT line at… — more information requested, 2.7 km away