LapsedWater & irrigation · East District, Sikkim

Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction of Water Tank From Seti Khola to Agricultural Engineering College in Ranipool, Gangtok District of Sikkim by College of Agricultural Engineering and Post Harvest Technology, Government of India.

Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction of Water Tank From Seti Khola to Agricultural Engineering College in Ranipool, Gangtok District of Sikkim by College of Agricultural Engineering and Post Harvest Technology, Government of India is a lapsed water and irrigation project in Naitam, Gangtok, East District, Sikkim. The site covers 0.1 acres. Its stated project cost is ₹11 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 23 Jun 2026).

See it on the live map All projects in East District

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction of Water Tank From Seti Khola to Agricultural Engineering College in Ranipool, Gangtok District of Sikkim by College of Agricultural Engineering and Post Harvest Technology, Government of India is a lapsed water and irrigation project in Naitam, Gangtok, East District, Sikkim. The site covers 0.1 acres.

Who is building it?

The applicant is Department of Agriculture & Farmers Welfare.

Has it been approved?

No. The application was lapsed on 23 Jun 2026, so it is no longer under consideration.

Where is it?

In Naitam, Gangtok, East District, Sikkim.

How big is it?

It has a stated cost of ₹11 lakh; a site of 0.1 acres and 390 m² of forest land.

When was it filed?

The application was filed on 26 May 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction of Water…

Project details

StatusLapsed
Status since23 Jun 2026
Application filed26 May 2025
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantDepartment of Agriculture & Farmers Welfare
Land area400 m²
Forest land390 m²
Project cost₹11 lakh
Village / localityNaitam
Taluk / tehsilGangtok
DistrictEast District
StateSikkim
Location fromSite boundary on record
Our referenceWID-SK-00081

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Jul 2026Under forest review0.1 acres₹11 lakh
New project filed 26 May 2025 (this page)Lapsed0.1 acres₹11 lakh

In context

14 applications in East District since January 2022 are in the same category (Water & irrigation): 2 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 64% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Naitam, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.