Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Nov 2022 |
| Application filed | 17 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bscpl Infrastructure Limited |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Appajipalli |
| Taluk / tehsil | 0 |
| District | Mahabubnagar |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00073 |
In context
63 applications in Mahabubnagar since January 2022 are in the same category (Mining): 45 approved, 11 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 57% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 89.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Appajipalli, 0, Mahabubnagar, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. BSCPL Infrastructure Ltd., — initial checks, 200 m away
- Mining project by M/s. BSCPL Infrastructure Ltd — cleared for impact study, 200 m away
- Sri. Manikanta Stone Metal Industry, 5.0 Ha, Stone and Metal Mine,Sy. No. 83,… — environmental approval granted, 250 m away
- Mining project by M/s. BSCPL Infrastructure Ltd., 8.00 Ha — initial checks, 300 m away
- Mining project by M/s. BSCPL Infrastructure Ltd — cleared for impact study, 300 m away
- Sri.B. Chandulal Naik — environmental approval granted, 450 m away
- Sri. Manikanta Stone Metal Industry, Building Stone & Road Metal Mine, 4.05… — under environmental review, 550 m away
- Mining project by M/s. Sri Durga Engineers and Rock Products. — environmental approval granted, 1.4 km away
All 8 Bscpl Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.