One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. BSCPL Infrastructure Ltd
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 May 2023 |
| Application filed | 5 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vijaya Nuthalapati |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Appajipalli |
| Taluk / tehsil | Balanagar |
| District | Mahabubnagar |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00797 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 6 May 2023 | Cleared for impact study | 12.7 acres | ₹50 lakh |
| Early planning filed 5 May 2023 (this page) | Cleared for impact study | 19.8 acres | ₹50 lakh |
In context
63 applications in Mahabubnagar since January 2022 are in the same category (Mining): 45 approved, 11 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.8 acres, this one is larger than 87% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 42 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Appajipalli, Balanagar, Mahabubnagar, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. BSCPL Infrastructure Ltd., 8.00 Ha — initial checks, 0 m away
- "Road Metal, Building Stone, Gravel Quarry lease" over an extent of 4.0 Ha. in… — environmental approval granted, 300 m away
- Sri. Manikanta Stone Metal Industry, 5.0 Ha, Stone and Metal Mine,Sy. No. 83,… — environmental approval granted, 450 m away
- Mining project by M/s. BSCPL Infrastructure Ltd — cleared for impact study, 500 m away
- Mining project by M/s. BSCPL Infrastructure Ltd., — initial checks, 500 m away
- Sri.B. Chandulal Naik — environmental approval granted, 700 m away
- Sri. Manikanta Stone Metal Industry, Building Stone & Road Metal Mine, 4.05… — under environmental review, 850 m away
- Mining project by M/s. Sri Durga Engineers and Rock Products. — environmental approval granted, 1.3 km away
More from Vijaya Nuthalapati in Mahabubnagar
- Mining project by M/s. BSCPL Infrastructure Ltd., 8.00 Ha — initial checks
- Mining project by M/s. BSCPL Infrastructure Ltd., — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.