RV Green Homes by RV Green Homes and Others is an approved building project in Srinagar, Maheshwaram, Ranga Reddy, Telangana. The site covers 19.8 acres. Its stated project cost is ₹140 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 Nov 2023).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is RV Green Homes by RV Green Homes and Others?

RV Green Homes by RV Green Homes and Others is an approved building project in Srinagar, Maheshwaram, Ranga Reddy, Telangana. The site covers 19.8 acres.

Who is building it?

The applicant is Rv Green Homes.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 16 Nov 2023), as of 27 Nov 2026.

Where is it?

In Srinagar, Maheshwaram, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹140 crore and a site of 19.8 acres.

When was it filed?

The application was filed on 16 Nov 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: RV Green Homes by RV Green Homes and Others

Project details

StatusEnvironmental approval granted
Status since16 Nov 2023
Application filed16 Nov 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRv Green Homes
Land area19.8 acres (8 ha)
Project cost₹140 crore
Village / localitySrinagar
Taluk / tehsilMaheshwaram
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-00091

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 21 Jul 2024Environmental approval granted19.8 acres₹140 crore
New project filed 16 Nov 2023 (this page)Environmental approval granted19.8 acres₹140 crore

What the filings say

The applicant, RV Green Homes, proposes to develop a gated community of residential villas on 8.0 hectares (19.77 acres) in Raviryal village. The project is designed to cater to the growing demand for housing near the commercial IT parks of Hyderabad.

What is planned

The project report describes a residential development featuring 167 villa units. Each villa is designed with a ground floor and two upper floors (G+2). Additionally, the project includes an amenities block or clubhouse with a basement, ground floor, and three upper floors (B+G+3). The total built-up area for the entire project is 68,541.3 square metres.

The villas are planned to incorporate Indian architectural principles of "Vastu." Each unit will be provided with two dedicated car parking spaces. The internal circulation plan includes a 15-metre wide spinal road, 12-metre sub-arterial roads, and an 18-metre wide connecting road.

ItemDetail
Total Units167 Villas
Total Built-up Area68,541.3 m²
Total Water Requirement121.5 KLD
STP Capacity125 m³
Solid Waste Generation542.6 kg/day
Green Area8,005.9 m²
Construction Period36 months

Land and surroundings

The site is located at Survey Nos. 116 (P), 117 (P), 118 (P), and 121 (P). It is currently barren land characterized by shrubs and rocky terrain. The site is surrounded by open lands in all directions. The nearest railway station is Falaknuma, situated approximately 13.58 km from the project.

Several reserved forests (RF) are located within the vicinity, including Kongara Kalan RF (2.13 km), Imaratkancha RF (3.49 km), Srinagar RF (4.15 km), Raviryal RF (4.33 km), and Maheswaram RF (7.89 km).

Water, power and access

The total water requirement during the operation phase is estimated at 121.5 kilolitres per day (KLD). The applicant proposes to draw this water from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB). To conserve water, a dual plumbing system will be used, allowing treated wastewater to be reused for toilet flushing (37.6 KLD) and green belt development (59.6 KLD).

A sewage treatment plant (STP) with a capacity of 125 cubic metres, utilizing Fluidized Aerobic Bio Reactor (FAB) technology, will be installed on-site. For rainwater management, the applicant plans to provide 167 harvesting pits, each measuring 1.5m x 1.5m x 2.0m, to enhance the groundwater table.

The total connected power load for the project is 2,179 kW, which will be sourced from TRANSCO. For emergency backup during the occupation phase, two diesel generator (DG) sets of 150 kVA each will be provided. Energy-saving measures include the installation of solar water heaters for the villas and solar-powered street lighting.

Environmental safeguards

The project includes a total green area of 8,005.9 square metres. The landscape plan includes avenue plantation and central greening using species such as Ficus benjamina, Kigelia pinnata, and Tabebuia rorea.

Solid waste generation is expected to be 542.6 kg per day. The applicant proposes to educate residents on source segregation into biodegradable, recyclable, and domestic hazardous waste. Biodegradable waste will be managed through an organic waste converter or bio-bins. Recyclable materials will be sold to authorized recyclers, while STP sludge (estimated at 8 kg per day) will be used as manure for the gardens.

Timeline

The applicant's project report indicates that the construction sequence for the entire project will take approximately 36 months to complete.

RV Green Homes site plan and layout

4 drawings from the project's filings. Sign in free to see them.

RV Green Homes: Site layout: villa plots, clubhouse, internal roads and green spaces (preview)🔒 Sign in free to see it
Site layout: villa plots, clubhouse, internal roads and green spaces
RV Green Homes: Typical villa floor plans, elevations and rainwater harvesting pit design (preview)🔒 Sign in free to see it
Typical villa floor plans, elevations and rainwater harvesting pit design
RV Green Homes: Sewage treatment plant flowchart using FAB technology (preview)🔒 Sign in free to see it
Sewage treatment plant flowchart using FAB technology
RV Green Homes: Location map showing the project site and surrounding reserved forests (preview)🔒 Sign in free to see it
Location map showing the project site and surrounding reserved forests

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.8 acres, this one is larger than 80% of them.

57 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Srinagar, Maheshwaram, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.