RV Green Homes by RV Green Homes and Others is an approved residential project in Srinagar, Maheshwaram, Ranga Reddy, Telangana. It plans 168 units in 169 towers of up to 3 floors on 19.8 acres.
Who is building it?
The applicant is Rv Green Homes.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Feb 2025), as of 27 Nov 2026.
Where is it?
In Srinagar, Maheshwaram, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹140 crore and a site of 19.8 acres.
When was it filed?
The application was filed on 21 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Feb 2025 |
| Application filed | 21 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Rv Green Homes |
| Use | Residential |
| Units | 168 |
| Towers | 169 |
| Floors (tallest) | 3 |
| Basements | 1 |
| Land area | 19.8 acres (8 ha) |
| Built-up area | 68,541 m² (7,37,768 sq ft) |
| Plot area | 80,086 m² (8,62,038 sq ft) |
| Project cost | ₹140 crore |
| Village / locality | Srinagar |
| Taluk / tehsil | Maheshwaram |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site area on record |
| Our reference | WID-TG-01261 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 21 Jul 2024 (this page) | Environmental approval granted | 19.8 acres | ₹140 crore |
| New project filed 16 Nov 2023 | Environmental approval granted | 19.8 acres | ₹140 crore |
What the filings say
What is planned
RV Green Homes is proposed as a gated community of residential villas located in Raviryal village. According to the applicant's conceptual plan, the project is an amendment to a previous environmental clearance (granted in March 2023) to increase the number of units and adjust utility capacities.
The project comprises 168 residential villas and one amenities block. The villas are designed with a Ground + 2 floor structure, while the amenities block is planned for Basement + Ground + 3 floors. The total built-up area for the project is 68,541.3 square metres.
| Item | Detail |
|---|---|
| Total Units | 168 Villas |
| Tallest Structure | B + G + 3 Floors (Amenities) |
| Total Built-up Area | 68,541.3 sqm |
| Parking Provision | 2 spaces per villa |
| Estimated Population | 1,000 to 1,200 persons |
| Project Timeline | Approximately 36 months |
Layout and design
The site layout is organized around a circulation plan featuring a 15-metre wide spinal road, 12-metre sub-arterial roads, and an 18-metre wide connecting road. The design incorporates Indian architectural principles of "Vastu."
Land allocation within the 8.00-hectare (19.77-acre) site includes:
- Villas (Site Area): 29,386.9 sqm
- Green Area: 8,005.9 sqm
- Road Area: 26,137.1 sqm
- Open Area: 13,753.7 sqm
- NALA (Drain) and Buffer Area: 1,402.5 sqm
- Amenities and Services: 1,399.5 sqm
Water, power and access
During the occupation stage, the total water requirement is estimated at 122.2 kilolitres per day (KLD). The applicant proposes to draw 84.4 KLD of fresh domestic water from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB). The remaining 37.8 KLD will be met through recycled treated wastewater used for flushing.
A sewage treatment plant (STP) with a capacity of 125 KLD, based on Fluidized Aerobic Bio Reactor (FAB) technology, will be installed. Treated water will be reused for green belt development (60 KLD) and flushing. Excess treated water is proposed to be discharged into the municipal sewer line.
The total connected power load is estimated at 2,189 kW, with a maximum demand of 1,313 kW, to be sourced from TRANSCO. Two diesel generator (DG) sets of 150 kVA each are planned for backup. Solar energy will be utilized for fencing, street lighting, and hot water systems in the villas, with estimated energy savings of 16.5%.
Environmental safeguards
The project site is located on rocky plains, requiring cut and fill operations involving approximately 16,017 cubic metres of earthwork. To manage storm water, the applicant proposes 168 rainwater harvesting pits, each measuring 1.5m x 1.5m x 2.0m.
Solid waste generation is anticipated to be 546 kg/day. The applicant plans to segregate waste at source into biodegradable (262.1 kg) and recyclable categories. Biodegradable waste will be processed in an on-site organic waste converter, while recyclables will be handed over to authorized recyclers. Construction and demolition waste, estimated at 3,427.06 tons over the two-year construction period, will be segregated for reuse in site leveling or sent to designated disposal facilities.
RV Green Homes site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.8 acres, this one is larger than 80% of them.
57 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Srinagar, Maheshwaram, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- RV Green Homes by RV Green Homes and Others — environmental approval granted, 0 m away
- S V Lake woods by M/s Sree Venkateswara Infra — environmental approval granted, 550 m away
- S V Lake woods by M/s Sree Venkateswara Infra — environmental approval granted, 550 m away
- Building project by M/s.Jaagruthi Housing and Infra Pvt. Ltd. — environmental approval granted, 700 m away
- Housing Gated and Community Villas by M/s. Vijayakalpa Developers Pvt.Ltd. — environmental approval granted, 1.3 km away
- proposing Villas with Gated Communities with Amenities by M/s. Kandhada… — environmental approval granted, 1.5 km away
- Proposed Villas with Gated Communities with Amenities with Builtup area of… — lapsed, 1.5 km away
- Proposed Villas with Gated Communities with Amenities with Builtup area of… — lapsed, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.