What is this project?
Amendment in Environmental Clearance For Construction of Proposed Commercial Building By M/s. Future Trends Techpark LLP is a lapsed building project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The site covers 1.6 acres.
Who is building it?
The applicant is Future Trends Tech Park LLP.
Has it been approved?
No. The application was lapsed on 3 May 2025, so it is no longer under consideration.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹153 crore and a site of 1.6 acres.
When was it filed?
The application was filed on 6 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 May 2025 |
| Application filed | 6 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Future Trends Tech Park LLP |
| Land area | 1.6 acres (0.6 ha) |
| Project cost | ₹153 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01123 |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.6 acres, this one is smaller than 87% of them.
168 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environmental Clearance of Proposed Commercial Building "The… — environmental approval granted, 0 m away
- Commercial Building Construction Project at Survey Nos. 19 to 25 and 42,… — environmental approval granted, 400 m away
- Building no 1 by M/s K Raheja IT Park (Hyderabad) Limited — environmental approval granted, 700 m away
- Building no. 8 by M/s K. Raheja IT Park (Hyderabad) Limited — cleared for impact study, 750 m away
- Building no. 8 by M/s K. Raheja IT Park (Hyderabad) Limited — environmental approval granted, 750 m away
- Building no. 8 by M/s K. Raheja IT Park (Hyderabad) Limited — environmental approval granted, 750 m away
- Building no. 8 by M/s K. Raheja IT Park (Hyderabad) Limited — cleared for impact study, 750 m away
- Proposed IT Office Building No. 5 by M/s. K. Raheja IT Park (Hyderabad)… — environmental approval granted, 850 m away
More from Future Trends Tech Park LLP in Ranga Reddy
- Amendment in Environmental Clearance of Proposed Commercial Building "The… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.