Quick answers
What is this project?
Amendment in Environmental Clearance of Proposed Commercial Building "The Kube" By M/s. Future Trends Techpark LLP is an approved commercial project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. It plans buildings of up to 17 floors on 1.6 acres.
Who is building it?
The applicant is Future Trends Tech Park LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Dec 2024), as of 27 Nov 2026.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹183 crore and a site of 1.6 acres.
When was it filed?
The application was filed on 15 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Dec 2024 |
| Application filed | 15 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Future Trends Tech Park LLP |
| Use | Commercial |
| Floors (tallest) | 17 |
| Basements | 4 |
| Parking spaces | 1,260 |
| Land area | 1.6 acres (0.6 ha) |
| Built-up area | 60,076 m² (6,46,652 sq ft) |
| Plot area | 6,351 m² (68,362 sq ft) |
| Project cost | ₹183 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01269 |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.6 acres, this one is smaller than 87% of them.
168 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environmental Clearance For Construction of Proposed Commercial… — lapsed, 0 m away
- Commercial Building Construction Project at Survey Nos. 19 to 25 and 42,… — environmental approval granted, 400 m away
- Building no 1 by M/s K Raheja IT Park (Hyderabad) Limited — environmental approval granted, 700 m away
- Building no. 8 by M/s K. Raheja IT Park (Hyderabad) Limited — cleared for impact study, 750 m away
- Building no. 8 by M/s K. Raheja IT Park (Hyderabad) Limited — environmental approval granted, 750 m away
- Building no. 8 by M/s K. Raheja IT Park (Hyderabad) Limited — environmental approval granted, 750 m away
- Building no. 8 by M/s K. Raheja IT Park (Hyderabad) Limited — cleared for impact study, 750 m away
- Proposed IT Office Building No. 5 by M/s. K. Raheja IT Park (Hyderabad)… — environmental approval granted, 850 m away
More from Future Trends Tech Park LLP in Ranga Reddy
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.