Quick answers
What is Sri B. Venkateshwar Reddy?
Sri B. Venkateshwar Reddy is an approved mining project in Nethivanipalle, Maldakal, Jogulamba Gadwal, Telangana. The site covers 9.9 acres.
Who is building it?
The applicant is B Venkateswar Reddy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Apr 2025), as of 27 Nov 2026.
Where is it?
In Nethivanipalle, Maldakal, Jogulamba Gadwal, Telangana.
How big is it?
It has a stated cost of ₹1 crore and a site of 9.9 acres.
When was it filed?
The application was filed on 3 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Apr 2025 |
| Application filed | 3 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | B Venkateswar Reddy |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Nethivanipalle |
| Taluk / tehsil | Maldakal |
| District | Jogulamba Gadwal |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01288 |
In context
9 applications in Jogulamba Gadwal since January 2022 are in the same category (Mining): 4 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nethivanipalle, Maldakal, Jogulamba Gadwal, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri. M. Sanjeev Bharadwaj — environmental approval granted, 11.2 km away
- Sri K.Thirupathi — environmental approval granted, 11.2 km away
- Building Stone & Road Metal Quarry of M/s. Sri Venkateshwara Stone Crusher — under environmental review, 11.4 km away
- Mining project by M/s Sri Venkateshwara Stone Crusher — lapsed, 11.5 km away
- Mining project by M/s. Megha Engineering & Infrastructures Ltd., (M/s. MEIL… — lapsed, 14 km away
- Mining project by M/s. Megha Engineering & Infrastructures Ltd., (M/s MEIL… — lapsed, 21.3 km away
- Proposed Stone & Metal Quarry of Sri. U. Krishna Murthy — environmental approval granted, 22.3 km away
- Stone and Metal Quarry of Sri A. Prabhakar Reddy — lapsed, 25.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.