Quick answers
What is Stone and Metal Quarry of Sri A. Prabhakar Reddy?
Stone and Metal Quarry of Sri A. Prabhakar Reddy is a lapsed mining project in Timmapuram, Itikyala, Jogulamba Gadwal, Telangana. The site covers 7.4 acres.
Who is building it?
The applicant is A Prabhakar reddy.
Has it been approved?
No. The application was lapsed on 1 Nov 2024, so it is no longer under consideration.
Where is it?
In Timmapuram, Itikyala, Jogulamba Gadwal, Telangana.
How big is it?
It has a stated cost of ₹45 lakh and a site of 7.4 acres.
When was it filed?
The application was filed on 5 Sept 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Nov 2024 |
| Application filed | 5 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | A Prabhakar reddy |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Timmapuram |
| Taluk / tehsil | Itikyala |
| District | Jogulamba Gadwal |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01644 |
In context
9 applications in Jogulamba Gadwal since January 2022 are in the same category (Mining): 4 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Timmapuram, Itikyala, Jogulamba Gadwal, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Sri Venkateshwara Stone Crusher — lapsed, 23.6 km away
- Building Stone & Road Metal Quarry of M/s. Sri Venkateshwara Stone Crusher — under environmental review, 23.7 km away
- For Proposed "Enhancement in Rectified Spirit / ENA / Ethanol / Pharma Grade… — initial checks, 24 km away
- Sri B. Venkateshwar Reddy — environmental approval granted, 25.6 km away
- Sri. M. Sanjeev Bharadwaj — environmental approval granted, 27.7 km away
- Mining project by M/s. Megha Engineering & Infrastructures Ltd., (M/s MEIL… — lapsed, 27.9 km away
- Sri K.Thirupathi — environmental approval granted, 27.9 km away
- Proposed Stone & Metal Quarry of Sri. U. Krishna Murthy — environmental approval granted, 35 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.