Quick answers
What is Mining project by M/s SSJ Granites?
This lapsed mining project by M/s SSJ Granites is in Korpul, Lingampet, Kamareddy, Telangana. The site covers 2.1 acres.
Who is building it?
The applicant is Balijapally Jyothi.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Korpul, Lingampet, Kamareddy, Telangana.
How big is it?
It has a stated cost of ₹40 lakh and a site of 2.1 acres.
When was it filed?
The application was filed on 31 Jul 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 31 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Balijapally Jyothi |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Korpul |
| Taluk / tehsil | Lingampet |
| District | Kamareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01319 |
In context
23 applications in Kamareddy since January 2022 are in the same category (Mining): 20 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.1 acres, this one is smaller than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Korpul, Lingampet, Kamareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Sahana Minerals Pvt Ltd — environmental approval granted, 0 m away
- "Diversion of 0.3267 ha of Forest Land (Out of Which 0.0854 ha falling in… — lapsed, 5 km away
- "Diversion of 0.3267 ha of Forest Land (Out of Which 0.0854 ha falling in… — application filed, 5 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — lapsed, 6.4 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — forest land use approved, 7.5 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — decision issued, 7.5 km away
- M/s Sapthagiri Mines & Minerals,22.70 Ha, Laterite Mine, Survey… — cleared for impact study, 11 km away
- Asst. Director of Mines & Geology Kamareddy Telangana State — environmental approval granted, 11.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.