Quick answers
What is Asst. Director of Mines & Geology Kamareddy Telangana State?
Asst. Director of Mines & Geology Kamareddy Telangana State is an approved mining project in Karadpalli, Tadwai, Kamareddy, Telangana. The site covers 12.1 acres.
Who is building it?
The applicant is Vijay Gurram.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Jun 2023), as of 27 Nov 2026.
Where is it?
In Karadpalli, Tadwai, Kamareddy, Telangana.
How big is it?
It has a stated cost of ₹30 lakh and a site of 12.1 acres.
When was it filed?
The application was filed on 24 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Jun 2023 |
| Application filed | 24 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vijay Gurram |
| Land area | 12.1 acres (4.9 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Karadpalli |
| Taluk / tehsil | Tadwai |
| District | Kamareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00532 |
In context
23 applications in Kamareddy since January 2022 are in the same category (Mining): 20 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.1 acres, this one is larger than 87% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Karadpalli, Tadwai, Kamareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacture 199 KLPD Ethanol (Grain based distillery) by M/s Vivek… — environmental approval granted, 2.9 km away
- M/s Sapthagiri Mines & Minerals,22.70 Ha, Laterite Mine, Survey… — cleared for impact study, 6.6 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — forest land use approved, 8.3 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — decision issued, 8.3 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — lapsed, 9.1 km away
- Mining project by M/s Sahana Minerals Pvt Ltd — environmental approval granted, 11.2 km away
- Mining project by M/s SSJ Granites — lapsed, 11.2 km away
- Building project by M/s. Subishi Projects — environmental approval granted, 12.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.