Quick answers
What is this project?
Commercial office Building Construction Project of Sri. Ponguleti Harsha Reddy and Sri. Ponguleti Prasad Reddy at Survey nos. 322 Part & 323 Part, Puppalaguda, Gandipet Mandal, Ranga Reddy District is an approved commercial project in Puppalguda (Og), Gandipet, Ranga Reddy, Telangana. It plans 1 tower of up to 9 floors on 0.9 acres.
Who is building it?
The applicant is Harsha Reddy Ponguleti.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Nov 2024), as of 27 Nov 2026.
Where is it?
In Puppalguda (Og), Gandipet, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹58.8 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 9 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Nov 2024 |
| Application filed | 9 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Harsha Reddy Ponguleti |
| Use | Commercial |
| Towers | 1 |
| Floors (tallest) | 9 |
| Basements | 3 |
| Parking spaces | 295 |
| Land area | 3,500 m² |
| Built-up area | 23,262 m² (2,50,390 sq ft) |
| Plot area | 3,452 m² (37,157 sq ft) |
| Project cost | ₹58.8 crore |
| Village / locality | Puppalguda (Og) |
| Taluk / tehsil | Gandipet |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01886 |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.9 acres, this one is smaller than 99% of them.
274 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Puppalguda (Og), Gandipet, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hospital Building Construction Project - Medicover Hospitals by M/s. Myscape… — environmental approval granted, 100 m away
- Building project by Sai Sravanthi Infra Projects Private Limited — cleared for impact study, 200 m away
- Commercial Building - SRI. RAVI SURESH by M/s. TAR IHA SPACES LLP — environmental approval granted, 450 m away
- Construction of Hotel & Office Building by M/s. ARS Hotels — environmental approval granted, 450 m away
- Mixed-Use Development (Retail, Office & Hotel Building) "9 FiDi" by M/s.… — environmental approval granted, 450 m away
- Commercial Office Building Construction Project by M/s. Paradigm Corporation… — environmental approval granted, 550 m away
- Sri. Ravi Suresh — environmental approval granted, 600 m away
- Residential Apartments Construction Project located at Survey No. 310(P),… — environmental approval granted, 600 m away
About this information