Residential Towers named "HALO" by M/s. Raghava Elite Park

Residential Towers named "HALO" by M/s. Raghava Elite Park is a lapsed building project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The site covers 5.1 acres. Its stated project cost is ₹721 crore. As of 27 Nov 2026, its status is “Lapsed” (since 17 Dec 2025).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Residential Towers named "HALO" by M/s. Raghava Elite Park?

Residential Towers named "HALO" by M/s. Raghava Elite Park is a lapsed building project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The site covers 5.1 acres.

Who is building it?

The applicant is Raghava Elite Park.

Has it been approved?

No. The application was lapsed on 17 Dec 2025, so it is no longer under consideration.

Where is it?

In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹721 crore and a site of 5.1 acres.

When was it filed?

The application was filed on 14 Nov 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Residential Towers named "HALO" by M/s. Raghava Elite Park

Project details

Official titleProposed Construction of Residential Towers named "HALO" by M/s. Raghava Elite Park.
StatusLapsed
Status since17 Dec 2025
Application filed14 Nov 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantRaghava Elite Park
Land area5.1 acres (2.1 ha)
Project cost₹721 crore
Village / localitySerilingampalli
Taluk / tehsilSerilingampally
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-02117

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 14 Nov 2025 (this page)Lapsed5.1 acres₹721 crore
New project filed 15 Oct 2025Environmental approval granted5.1 acres₹721 crore
Early planning filed 20 Sept 2025Cleared for impact study5.1 acres₹721 crore

What the filings say

What is planned

M/s. Raghava Elite Park proposes to construct a residential development named ‘HALO’ in Madeenaguda, Serilingampally. The applicant’s project report states that the development will consist of three residential towers (Towers A, B, and C) and a separate club house. Each of the three towers is designed with four cellar levels, a stilt floor, a ground floor, and 55 upper floors. The club house is planned as a ground-plus-six-floor structure.

The project is designed to accommodate 1,082 residential units, all of which are specified as 3 BHK apartments. The total built-up area is 3,11,539.49 square metres. Amenities such as a gym, indoor games, a swimming pool, a supermarket, and a banquet hall are included in the ground floors of the towers and the club house.

Project Components

ItemDetail
Total Residential Units1,082 (all 3 BHK)
Number of Towers3 (Tower A, B, C)
Floors per Tower4C + S + G + 55
Club House FloorsG + 6
Total Built-up Area3,11,539.49 sq. m
Total Parking Area78,567.82 sq. m
Estimated Project Cost‑ 721 crore

Layout and design

The site layout allocates 46.89% of the land (9,755.18 sq. m) to the plotted area for the buildings. A 45-metre wide road is proposed adjacent to the site as per the master plan. Internal circulation is managed through an 11-metre wide fire driveway and 5-metre wide internal driveways in the cellar floors.

Parking is provided across the four cellar levels and the stilt floor, offering space for 1,964 cars and 1,473 two-wheelers. This represents approximately 33.72% of the built-up area, meeting local regulatory requirements. The design includes 2,082.12 sq. m (10.01%) for a greenbelt and 2,298.14 sq. m (11.05%) for tot-lot areas.

Land and surroundings

The project is located at Survey Nos. 49 Part and several sub-divisions in Madeenaguda village. The site is currently open, undeveloped land. The surrounding area is described as rapidly developing with existing residential buildings, business centres, and educational institutions.

Environmental settings within a 10 km radius include several reserved forests: Kottaguda (3.4 km SE), Kazipalli (9.5 km N), and Gajularamram (9.8 km NE). The nearest railway station is Chandanagar, located 0.36 km away. Numerous water bodies are in the vicinity, the closest being Mallaih Kunta (0.4 km N) and Gopi Cheruvu (0.6 km SW). The site falls under Seismic Zone II.

Water, power and access

During the operation phase, the total water requirement is estimated at 777 KLD. The applicant plans to source 501 KLD of fresh water from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWS & SB). The remaining 276 KLD will be met through recycled water from an on-site Sewage Treatment Plant (STP).

The total electrical load is estimated at 8,115 KVA, to be supplied by the Telangana State Southern Power Distribution Company Limited (TGSPDCL). For backup, the applicant proposes to install three DG sets of 1,010 KVA and one of 500 KVA. Additionally, 4% of the power requirement is intended to be met through solar energy, including solar street lighting and water heaters.

Environmental safeguards

An on-site STP with a capacity of 725 KLD using Moving Bed Biofilm Reactor (MBBR) technology is planned to treat 604 KLD of generated wastewater. Treated water will be reused for flushing and greenbelt maintenance.

Solid waste generation is estimated at 2,840 kg/day. The applicant proposes an in-house Organic Waste Converter (OWC) to treat 1,704 kg/day of organic waste, with the resulting compost used as manure. Inorganic waste (852 kg/day) will be sent to recyclers, and inert waste (284 kg/day) will be sent to the municipal dump yard.

For rainwater management, 30 recharge pits are planned. The storm water system is designed to collect roof-top runoff in storage sumps for reuse after primary treatment, while surface runoff will be diverted to drains with silt and oil-grease traps.

Timeline

The applicant expects to complete the project within three years from the date of receiving building permissions from the Greater Hyderabad Municipal Corporation (GHMC).

Raghava Elite Park Residential Towers Named "HALO" site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Raghava Elite Park Residential Towers Named "HALO": Site layout: tower footprints, driveways, and greenbelt areas (preview)🔒 Sign in free to see it
Site layout: tower footprints, driveways, and greenbelt areas
Raghava Elite Park Residential Towers Named "HALO": Master Plan: building arrangement and site boundaries (preview)🔒 Sign in free to see it
Master Plan: building arrangement and site boundaries
Raghava Elite Park Residential Towers Named "HALO": Location map showing project site and surrounding road network (preview)🔒 Sign in free to see it
Location map showing project site and surrounding road network
Raghava Elite Park Residential Towers Named "HALO": STP Flow Chart: MBBR technology treatment process (preview)🔒 Sign in free to see it
STP Flow Chart: MBBR technology treatment process

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.1 acres, this one is smaller than 55% of them.

79 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Raghava Elite Park projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.