Quick answers
What is Township project by M/s. DSR Infrastructure Pvt. Ltd?
This proposed township project by M/s. DSR Infrastructure Pvt. Ltd is in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The site covers 11 acres.
Who is building it?
The applicant is Pellakuru Sahith Reddy.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Feb 2026), as of 27 Nov 2026.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹1,229 crore and a site of 11 acres.
When was it filed?
The application was filed on 10 Feb 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Building project by M/s. DSR Infrastructure Pvt. Ltd
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 Feb 2026 |
| Application filed | 10 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Pellakuru Sahith Reddy |
| Use | Township |
| Land area | 11 acres (4.5 ha) |
| Built-up area | 5,58,288 m² (60,09,356 sq ft) |
| Project cost | ₹1,229 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03295 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 May 2026 | Environmental approval granted | 11 acres | ₹1,229 crore |
| New project filed 18 Mar 2026 | Returned to applicant | 11 acres | ₹1,229 crore |
| Early planning filed 10 Feb 2026 (this page) | Cleared for impact study | 11 acres | ₹1,229 crore |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11 acres, this one is larger than 67% of them.
84 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. DSR Infrastructure Pvt. Ltd — environmental approval granted, 0 m away
- Building project by M/s. DSR Infrastructure Pvt. Ltd — returned to applicant, 0 m away
- Residential Apartments construction project located at Survey No. 49,… — environmental approval granted, 450 m away
- Residential Apartments construction project located at Survey No. 49,… — cleared for impact study, 450 m away
- Residential Towers named "HALO" by M/s. Raghava Elite Park — lapsed, 450 m away
- Residential Towers named "HALO" by M/s. Raghava Elite Park — environmental approval granted, 450 m away
- Residential Towers named "HALO" by M/s. Raghava Elite Park — cleared for impact study, 450 m away
- Cyberian Villas by M/s Precast Building Systems (India) Private Limited — environmental approval granted, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.