Proposed Building Stone & Road Metal Quarry of M/s. Sri Rama Stone Crusher is an approved mining project in Lingupalli, Domakonda, Kamareddy, Telangana. The site covers 2.5 acres.
Who is building it?
The applicant is S Ramulu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Apr 2026), as of 27 Nov 2026.
Where is it?
In Lingupalli, Domakonda, Kamareddy, Telangana.
How big is it?
It has a stated cost of ₹25 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 28 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Apr 2026 |
| Application filed | 28 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | S Ramulu |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Lingupalli |
| Taluk / tehsil | Domakonda |
| District | Kamareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03040 |
In context
23 applications in Kamareddy since January 2022 are in the same category (Mining): 20 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Lingupalli, Domakonda, Kamareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Submission of No Increase in Pollution Load for the proposed Change of Product… — initial checks, 2.5 km away
- Request for Transfer of Environmental Clearance from M/s. Raghava Life… — under environmental review, 2.6 km away
- Transfer of existing Environmental Clearance from M/s. Scikem Pharmaceuticals… — environmental approval granted, 6.4 km away
- Transfer of existing Environmental Clearance from M/s. Scikem Pharmaceuticals… — lapsed, 6.4 km away
- Expansion of existing bulk drug and intermediate manufacturing unit — under environmental review, 6.5 km away
- Expansion of existing bulk drug and intermediate manufacturing unit — cleared for impact study, 6.5 km away
- Amendment in existing Environmental Clearance (EC) for addition of land and… — returned to applicant, 6.5 km away
- Amendment in existing Environmental Clearance (EC) for addition of land and… — returned to applicant, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.