Quick answers
What is this project?
Submission of No Increase in Pollution Load for the proposed Change of Product Mix by Vijaya Sai Laboratories India Pvt. Ltd. is an established Bulk Drugs & Drug Intermediates manufacturing unit located at Sy. No's.: 888, 889 & 901, Jangampally Village, Bhiknoor Mandal, Kamareddy District, Telangana State in an area of 6.03 Acre (24402.54 Sq. m) with Production capacity of 3133.33 Kg/ Day (94.0 TPM) is a proposed industrial building project in Jangampalli, Bhiknoor, Kamareddy, Telangana. The site covers 6 acres.
Who is building it?
The applicant is Vijaya Sai Laboratories India PVT. LTD..
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Jangampalli, Bhiknoor, Kamareddy, Telangana.
How big is it?
It has a stated cost of ₹3.5 crore and a site of 6 acres.
When was it filed?
The application was filed on 4 May 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 4 May 2026 |
| Application filed | 4 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Vijaya Sai Laboratories India PVT. LTD. |
| Use | Industrial |
| Land area | 6 acres (2.4 ha) |
| Plot area | 24,403 m² (2,62,671 sq ft) |
| Project cost | ₹3.5 crore |
| Village / locality | Jangampalli |
| Taluk / tehsil | Bhiknoor |
| District | Kamareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03395 |
In context
5 applications in Kamareddy since January 2022 are in the same category (Buildings & townships): 1 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jangampalli, Bhiknoor, Kamareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Request for Transfer of Environmental Clearance from M/s. Raghava Life… — under environmental review, 200 m away
- Proposed Building Stone & Road Metal Quarry of M/s. Sri Rama Stone Crusher — environmental approval granted, 2.5 km away
- Transfer of existing Environmental Clearance from M/s. Scikem Pharmaceuticals… — environmental approval granted, 6.8 km away
- Transfer of existing Environmental Clearance from M/s. Scikem Pharmaceuticals… — lapsed, 6.8 km away
- Expansion of existing bulk drug and intermediate manufacturing unit — under environmental review, 6.8 km away
- Expansion of existing bulk drug and intermediate manufacturing unit — cleared for impact study, 6.8 km away
- Amendment in existing Environmental Clearance (EC) for addition of land and… — returned to applicant, 6.8 km away
- Amendment in existing Environmental Clearance (EC) for addition of land and… — returned to applicant, 6.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.