Quick answers
What is this project?
Residential Apartments Construction Project located at Survey No. 112/2, Kondapur Village, Serilingamlpally Mandal, Ranaga Reddy District, Telangana by M/s. Mahathi Infrastructures Company and Others is a lapsed residential project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. It plans 99 units in 1 tower of up to 10 floors on 1.1 acres.
Who is building it?
The applicant is Mahathi Infrastructures Company.
Has it been approved?
No. The application was lapsed on 9 Nov 2026, so it is no longer under consideration.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹100 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 21 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Residential Apartments Construction Project located at Survey No. 112/2, Kondapur…
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 21 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Mahathi Infrastructures Company |
| Use | Residential |
| Units | 99 |
| Towers | 1 |
| Floors (tallest) | 10 |
| Basements | 2 |
| Parking spaces | 286 |
| Land area | 1.1 acres (0.5 ha) |
| Built-up area | 27,614 m² (2,97,234 sq ft) |
| Plot area | 4,571 m² (49,202 sq ft) |
| Project cost | ₹100 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03551 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 21 Aug 2026 (this page) | Lapsed | 1.1 acres | ₹100 crore |
| New project filed 6 Dec 2024 | Environmental approval granted | 1.1 acres | ₹65 crore |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.1 acres, this one is smaller than 95% of them.
123 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Apartments Construction Project located at Survey No. 112/2,… — environmental approval granted, 0 m away
- Residential Apartment construction project by M/s Jaswitha Constructions and… — lapsed, 150 m away
- Residential Complex by M/s. Sreenidhi Luxury Homes Private Limited & Others — environmental approval granted, 600 m away
- Somaskanda – High Rise Residential Apartments proposed by Arunachala Logistics… — environmental approval granted, 700 m away
- Residential Apartments Construction Project – Residential Hi-Rise Buildings by… — environmental approval granted, 700 m away
- Residential Apartments Construction Project – Residential Hi-Rise Buildings by… — cleared for impact study, 700 m away
- Candeur Lakescape by M/S Candeur Constructions Private Limited — environmental approval granted, 800 m away
- Candeur Lakescape by M/S Candeur Constructions Private Limited — cleared for impact study, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.