What is Developing? Open the mapMap

WithdrawnBuildings & townships · Ranga Reddy, Telangana

Multi-Storied Residential Building by M/s. Dhamam Neethushree Infra LLP

Multi-Storied Residential Building by M/s. Dhamam Neethushree Infra LLP is a withdrawn building project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The site covers 1.5 acres. Its stated project cost is ₹77 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 1 Jun 2026).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Multi-Storied Residential Building by M/s. Dhamam Neethushree Infra LLP is a withdrawn building project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The site covers 1.5 acres.

Who is building it?

The applicant is Dhamam Neethushree Infra LLP.

Has it been approved?

No. The application was withdrawn on 1 Jun 2026, so it is no longer under consideration.

Where is it?

In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹77 crore and a site of 1.5 acres.

When was it filed?

The application was filed on 1 Jun 2026.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Multi-Storied Residential Building by M/s. Dhamam Neethushree Infra LLP

Project details

Official titleProposed Construction of Multi-Storied Residential Building by M/s. Dhamam Neethushree Infra LLP
StatusWithdrawn
Status since1 Jun 2026
Application filed1 Jun 2026
Approval soughtEnvironmental approval
Application typeOther
SectorBuildings & townships
ApplicantDhamam Neethushree Infra LLP
Land area1.5 acres (0.6 ha)
Project cost₹77 crore
Village / localitySerilingampalli
Taluk / tehsilSerilingampally
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-03619

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 5 Aug 2026More information requested1.5 acres₹82 lakh
Amendment filed 1 Jul 2026Returned to applicant1.5 acres₹96 crore
Other filed 1 Jun 2026 (this page)Withdrawn1.5 acres₹77 crore
New project filed 15 Oct 2024Environmental approval granted1.5 acres₹77 crore

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.5 acres, this one is smaller than 90% of them.

245 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Dhamam Neethushree Infra projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.