Quick answers
What is this project?
Multi Storied Residential Building by M/s Dhamam Neethushree Infra LLP is a withdrawn building project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The site covers 1.5 acres.
Who is building it?
The applicant is Pallala Krishna Reddy.
Has it been approved?
No. The application was withdrawn on 5 Jun 2026, so it is no longer under consideration.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹96 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 5 Jun 2026.
Project details
| Official title | Proposed Construction of Multi Storied Residential Building by M/s Dhamam Neethushree Infra LLP |
|---|---|
| Status | Withdrawn |
| Status since | 5 Jun 2026 |
| Application filed | 5 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Pallala Krishna Reddy |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹96 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03690 |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.5 acres, this one is smaller than 90% of them.
246 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Multi storied Residential Building by M/s Dhamam Neethushree Infra LLP — more information requested, 0 m away
- Multi-Storied Residential Building by M/s. Dhamam Neethushree Infra LLP — returned to applicant, 0 m away
- Multi-Storied Residential Building by M/s. Dhamam Neethushree Infra LLP — withdrawn, 0 m away
- Multi-Storied Residential Building by M/s. Dhamam Neethushree Infra LLP — environmental approval granted, 0 m away
- Commercial Building Construction Project by M/s. Cybage Software Private… — environmental approval granted, 50 m away
- Expansion of Asian Institute of Gastroenterology Hospitals — environmental approval granted, 600 m away
- Asian Institute of Gastroenterology Hospitals (Expansion-III) — environmental approval granted, 650 m away
- Asian Institute of Gastroenterology Hospitals (Expansion-III) — cleared for impact study, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.