What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Ranga Reddy, Telangana

State Bank of India has proposed for Construction of 134 Residential Flats (2 Towers), DMD Bungalow, Office Building, and Club House for SBI Enclave

State Bank of India has proposed for Construction of 134 Residential Flats (2 Towers), DMD Bungalow, Office Building, and Club House for SBI Enclave is an approved mixed-use project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. It plans 134 units in 2 towers of up to 26 floors on 8.8 acres. Its stated project cost is ₹29 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 Sept 2026).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

State Bank of India has proposed for Construction of 134 Residential Flats (2 Towers), DMD Bungalow, Office Building, and Club House for SBI Enclave is an approved mixed-use project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. It plans 134 units in 2 towers of up to 26 floors on 8.8 acres.

Who is building it?

The applicant is State Bank of India.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 19 Sept 2026), as of 27 Nov 2026.

Where is it?

In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹29 crore and a site of 8.8 acres.

When was it filed?

The application was filed on 9 Jul 2026.

Project details

StatusEnvironmental approval granted
Status since19 Sept 2026
Application filed9 Jul 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantState Bank of India
UseMixed use
Units134
Towers2
Floors (tallest)26
Basements2
Parking spaces394
Land area8.8 acres (3.6 ha)
Built-up area97,315 m² (10,47,489 sq ft)
Plot area35,770 m² (3,85,025 sq ft)
Project cost₹29 crore
Village / localitySerilingampalli
Taluk / tehsilSerilingampally
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-03760

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.8 acres, this one is larger than 60% of them.

146 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 5 State Bank of India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.