Quick answers
What is this project?
Diversion of 2.6389 Hectors of Forest Land in Bhadrachalam Division for the Work Constrution of T Road Fro (R&b) Road Laxminagaram to Laxmipuram Road From Km 0/0-20/0 is a lapsed road project in Arlagudem, Dummugudem, Bhadradri Kothagudem, Telangana. The site covers 6.5 acres.
Who is building it?
The applicant is Roads and Buildings Department.
Has it been approved?
No. The application was lapsed on 4 Apr 2024, so it is no longer under consideration.
Where is it?
In Arlagudem, Dummugudem, Bhadradri Kothagudem, Telangana.
How big is it?
It has a stated cost of ₹21.2 crore; a site of 6.5 acres and 6.5 acres (2.6 ha) of forest land.
When was it filed?
The application was filed on 27 Dec 2023.
Project details
| Official title | Diversion of 2.6389 Hectors of Forest Land in Bhadrachalam Division for the Work Constrution of T Road Fro (R&b) Road Laxminagaram to Laxmipuram Road From Km 0/0-20/0 in Bhadradri Kothagudem District |
|---|---|
| Status | Lapsed |
| Status since | 4 Apr 2024 |
| Application filed | 27 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Roads and Buildings Department |
| Land area | 6.5 acres (2.6 ha) |
| Forest land | 6.5 acres (2.6 ha) |
| Project cost | ₹21.2 crore |
| Village / locality | Arlagudem |
| Taluk / tehsil | Dummugudem |
| District | Bhadradri Kothagudem |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03859 |
In context
21 applications in Bhadradri Kothagudem since January 2022 are in the same category (Roads & highways): 0 approved, 7 filed or under review, and 14 withdrawn, lapsed or rejected. At 6.5 acres, this one is smaller than 73% of them.
Where it is
Arlagudem, Dummugudem, Bhadradri Kothagudem, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri. Uyika Narasimha Rao — environmental approval granted, 5.7 km away
- Proposed Quartz & Feldspar Quarry of Sri Uyika Narasimha Rao — lapsed, 5.7 km away
- Sri Uyika Narasimha Rao, — lapsed, 5.7 km away
- 4G Saturation Project_Mission 500_Funded by USOF_GOI — lapsed, 8 km away
- 4G Saturation Project_Mission 500_Funded by USOF_GOI — lapsed, 8 km away
- 4G Saturation Project_Mission 500_Funded by USOF_GOI — lapsed, 8 km away
- Diversion of 0.071 Ha of Forest Land for laying of Optical Fiber Cable along… — more information requested, 9.6 km away
- Gangolu Sand Reach, Godavari River by M/s. Telangana State Mineral Development… — environmental approval granted, 10.7 km away
More from Roads and Buildings Department in Bhadradri Kothagudem
- Diversion of 6.2849 Ha of forest land for formation of BT Road from Veerapuram… — lapsed
- Diversion of 3.5212 Ha of forest land for construction of BT Road from… — initial checks
- Diversion of 3.2127 Ha of Forest Land for Construction of Bt Road From… — application filed
- Diversion of 3.2127 Ha of Forest Land for Construction of Bt Road From… — initial checks
- Diversion of 1.812 Ha of Forest Land in Bhadrachalam Division for the Work… — lapsed
- Diversion of 14.3026 Ha of Forest Land in Yellandu and Tadwai Division for the… — lapsed
15 Roads and Buildings Department projects in Bhadradri Kothagudem
All 36 Roads and Buildings Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.