What is 4G Saturation Project_Mission 500_Funded by USOF_GOI?
4G Saturation Project_Mission 500_Funded by USOF_GOI is a lapsed project in Kommanapalle, Dummugudem, Bhadradri Kothagudem, Telangana. It seeks 0 acres of forest land.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Kommanapalle, Dummugudem, Bhadradri Kothagudem, Telangana.
How big is it?
It has a stated cost of ₹62 lakh and 200 m² of forest land.
When was it filed?
The application was filed on 2 Nov 2023.
One of 3 filings for this project. The project's main page, with every filing and where each stands: 4G Saturation Project_Mission 500_Funded by USOF_GOI
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 2 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Forest land | 200 m² |
| Project cost | ₹62 lakh |
| Village / locality | Kommanapalle |
| Taluk / tehsil | Dummugudem |
| District | Bhadradri Kothagudem |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04137 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Nov 2023 | Lapsed | ₹62 lakh | |
| New project filed 2 Nov 2023 (this page) | Lapsed | ₹62 lakh | |
| New project filed 7 Aug 2023 | Lapsed | ₹62 lakh |
In context
12 applications in Bhadradri Kothagudem since January 2022 are in the same category (Other): 5 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kommanapalle, Dummugudem, Bhadradri Kothagudem, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project_Mission 500_Funded by USOF_GOI — lapsed, 0 m away
- 4G Saturation Project_Mission 500_Funded by USOF_GOI — lapsed, 0 m away
- Diversion of 0.071 Ha of Forest Land for laying of Optical Fiber Cable along… — more information requested, 2.2 km away
- Sri. Uyika Narasimha Rao — environmental approval granted, 3.1 km away
- Proposed Quartz & Feldspar Quarry of Sri Uyika Narasimha Rao — lapsed, 3.1 km away
- Sri Uyika Narasimha Rao, — lapsed, 3.1 km away
- Diversion of 2.5937 Hectores of Forest Land in Bhadrachalam Division for the… — lapsed, 3.2 km away
- Diversion of 2.6389 Hectors of Forest Land in Bhadrachalam Division for the… — lapsed, 8 km away
More from Mahesh Nair in Bhadradri Kothagudem
- Diversion of 0.0201 Ha forest land for Construction of 4G Mobile tower under… — forest land use approved
- Bsnl 4g Saturatiion Project Khammam — forest land use approved
- Bsnl 4g Saturatiion Project Khammam — forest land use approved
- Bsnl 4g Saturatiion Project Khammam — forest land use approved
- Bsnl 4g Saturatiion Project Khammam — forest land use approved
- Bsnl 4g Saturatiion Project Khammam — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.