Quick answers
What is this project?
Diversion of 0.2335 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Kasalabad Ramaram, Vaddepalli Meenajipet, RF of Siddipet Forest Division is a proposed telecom project in Kasulabad, Mirdoddi, Siddipet, Telangana. The site covers 0.6 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kasulabad, Mirdoddi, Siddipet, Telangana.
How big is it?
It has a stated cost of ₹26 lakh; a site of 0.6 acres and 2,340 m² of forest land.
When was it filed?
The application was filed on 9 Jan 2024.
Project details
| Official title | Diversion of 0.2335 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Kasalabad Ramaram, Vaddepalli Meenajipet, RF of Siddipet Forest Division in Siddipet District, Telangana State in Favor of M/s Bharti Airtel Limited. |
|---|---|
| Status | More information requested |
| Status since | 5 May 2026 |
| Application filed | 9 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 2,300 m² |
| Forest land | 2,340 m² |
| Project cost | ₹26 lakh |
| Village / locality | Kasulabad |
| Taluk / tehsil | Mirdoddi |
| District | Siddipet |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03963 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kasulabad, Mirdoddi, Siddipet, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s.Ravitej Prjects- Building Stone & Road Metal - 5.490 Ha. — not approved, 2.7 km away
- Diversion of 0.5107 ha of Forest land for BT Road from Malkapur to Nacharam… — lapsed, 6.3 km away
- Diversion of 0.0781 Ha of Forest Land to Maharashtra Natural Gas Limited… — forest land use approved, 13.1 km away
- Industrial project by M/S KDA Ispat Private Limited — environmental approval granted, 16 km away
- Industrial project by M/S KDA Ispat Private Limited — cleared for impact study, 16 km away
- Mining project by M/s. Rock More Aggregates — cleared for impact study, 18.1 km away
- Diversion of Forest Land to an Extent of 0.2355 Ha. in Narsampally and Gajwel… — forest land use approved, 18.6 km away
- Laying of Ug Steel Gas Pipeline for the Supply of Piped Natural Gas With in… — approval revoked, 18.6 km away
More from Bharti Airtel Limited in Siddipet
- Diversion of 0.125 (Revised From 0.1511 Ha) From Gajwel to Bhongir Passing… — more information requested
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.