Quick answers
What is this project?
Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc Cables (Insulated) for Waipet Feeder Channel in (4) St Habitations is a lapsed power project in Lachimpur, Sirikonda, Adilabad, Telangana. The site covers 4.6 acres.
Who is building it?
The applicant is Tsnpdcl.
Has it been approved?
No. The application was lapsed on 19 Nov 2025, so it is no longer under consideration.
Where is it?
In Lachimpur, Sirikonda, Adilabad, Telangana.
How big is it?
It has a stated cost of ₹46 lakh; a site of 4.6 acres and 4.6 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 10 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc Cables…
Project details
| Official title | Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc Cables (Insulated) for Waipet Feeder Channel in (4) St Habitations of in Adilabad District |
|---|---|
| Status | Lapsed |
| Status since | 19 Nov 2025 |
| Application filed | 10 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Tsnpdcl |
| Land area | 4.6 acres (1.9 ha) |
| Forest land | 4.6 acres (1.8 ha) |
| Project cost | ₹46 lakh |
| Village / locality | Lachimpur |
| Taluk / tehsil | Sirikonda |
| District | Adilabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03972 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Apr 2025 (this page) | Lapsed | 4.6 acres | ₹46 lakh |
| New project filed 24 Aug 2024 | More information requested | 4.6 acres | ₹46 lakh |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lachimpur, Sirikonda, Adilabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — more information requested, 0 m away
- Diversion of 0.042 Ha of Forest Land for Construction of 4G Mobile Tower and… — under wildlife review, 3.3 km away
- Diversion of 0.042 Ha of Forest Land for Construction of 4G Mobile Tower and… — forest land use approved, 3.3 km away
- Diversion of 4.0480 ha of Forest Land proposal for laying of Optical Fiber… — under wildlife review, 4.7 km away
- Diversion of 4.0480 ha of Forest Land proposal for laying of Optical Fiber… — more information requested, 4.7 km away
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — lapsed, 8.3 km away
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — more information requested, 8.3 km away
- Diversion of 0.0334 Ha of Forest Land for Construction of Mobile Tower under… — lapsed, 8.8 km away
More from Tsnpdcl in Adilabad
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — lapsed
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.