Quick answers
What is this project?
Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc Cables (Insulated) for Srichelma Feeder Channel in (5) St Habitations is a proposed project in Narsapur, Ichoda, Adilabad, Telangana. The site covers 3.9 acres.
Who is building it?
The applicant is Tsnpdcl.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Narsapur, Ichoda, Adilabad, Telangana.
How big is it?
It has a stated cost of ₹39 lakh and a site of 3.9 acres.
When was it filed?
The application was filed on 24 Aug 2024.
Project details
| Official title | Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc Cables (Insulated) for Srichelma Feeder Channel in (5) St Habitations of in Adilabad District |
|---|---|
| Status | More information requested |
| Status since | 24 Aug 2024 |
| Application filed | 24 Aug 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Tsnpdcl |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹39 lakh |
| Village / locality | Narsapur |
| Taluk / tehsil | Ichoda |
| District | Adilabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04516 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Apr 2025 | Lapsed | 3.9 acres | ₹39 lakh |
| New project filed 24 Aug 2024 (this page) | More information requested | 3.9 acres | ₹39 lakh |
In context
8 applications in Adilabad since January 2022 are in the same category (Other): 0 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Narsapur, Ichoda, Adilabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — lapsed, 0 m away
- Diversion of 0.042 Ha of Forest Land for Construction of 4G Mobile Tower and… — under wildlife review, 5.2 km away
- Diversion of 0.042 Ha of Forest Land for Construction of 4G Mobile Tower and… — forest land use approved, 5.2 km away
- 6MW Mini Hydel Project at Kuntala Water Fall for Producing of Non Conventional… — lapsed, 6.7 km away
- 6MW Mini Hydel Project at Kuntala Water Fall for Producing of Non Conventional… — more information requested, 6.7 km away
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — lapsed, 8.3 km away
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — more information requested, 8.3 km away
- Diversion of 4.0480 ha of Forest Land proposal for laying of Optical Fiber… — under wildlife review, 12.3 km away
More from Tsnpdcl in Adilabad
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — lapsed
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.