Project details
| Official title | Proposal for Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of 4g Based Mobile Services at Mha Identified Locations in Left Wing Extremism (Lwe-Ii) Affected Areas to an Extent of Area 0.1987 Ha From Polepalli-Chitriyala Along the Road Within the Existing Row Passing Through Nidigal Rf of Nagarjunsagar Forest Division of Nalgonda District, Telangana State in Favour of M/S. Bharti Airtel Limited, Hyderabad. |
|---|---|
| Status | More information requested |
| Status since | 25 Oct 2025 |
| Application filed | 18 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Forest land | 1,990 m² |
| Project cost | ₹22 lakh |
| Village / locality | Chitrial |
| Taluk / tehsil | Chandampeta |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04085 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Aug 2025 | Forest land use approved | ₹22 lakh | |
| New project filed 18 Nov 2023 (this page) | More information requested | ₹22 lakh | |
| New project filed 30 Aug 2023 | More information requested | ₹22 lakh |
In context
7 applications in Nalgonda since January 2022 are in the same category (Telecom): 2 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Chitrial, Chandampeta, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of 4g… — forest land use approved, 0 m away
- Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of 4g… — more information requested, 0 m away
- Dindi Balancing Reservoir of AMRSLBC Tunnel scheme across Dindi river near… — under wildlife review, 7 km away
- Dindi Balancing Reservoir of AMRSLBC Tunnel scheme across Dindi river near… — under forest review, 7 km away
- Laying of Optical Fibre Cable between Mannevaripalli-Tatikole along the road… — not approved, 9.3 km away
- Laying of Optical Fibre Cable between Mannevaripalli-Tatikole along the road… — decision issued, 9.3 km away
- Diversion of 0.81 Ha of Forest land — lapsed, 9.7 km away
- Smt. SHYAMALA RAMAVATH — environmental approval granted, 13.7 km away
More from Bharti Airtel Limited in Nalgonda
4 Bharti Airtel (Airtel) projects in Nalgonda
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.