Project details
| Official title | Proposal for diversion of 0.81 Ha of Forest land in Achampet Division of Nagarkurnool District of Amrabad Tiger Reserve for FDR to Construction of 10 vents of 10m span High Level Bridge at Km 24/8-10 in between Bollaram & Akkaram Villages and 3 vents of 6m Span Box culvert at Km 21/4-6 on Dindi - Devarakonda road to Kambala pally road in Nalgonda District in favour of Executive Engineer R&B Division Miryalguda. |
|---|---|
| Status | Lapsed |
| Status since | 7 Mar 2024 |
| Application filed | 5 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Department |
| Land area | 2 acres (0.8 ha) |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹5.5 crore |
| Village / locality | Bolaram |
| Taluk / tehsil | Chandampeta |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03891 |
In context
5 applications in Nalgonda since January 2022 are in the same category (Roads & highways): 0 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Bolaram, Chandampeta, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dindi Balancing Reservoir of AMRSLBC Tunnel scheme across Dindi river near… — under wildlife review, 7.8 km away
- Dindi Balancing Reservoir of AMRSLBC Tunnel scheme across Dindi river near… — under forest review, 7.8 km away
- Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of 4g… — forest land use approved, 9.7 km away
- Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of 4g… — more information requested, 9.7 km away
- Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of 4g… — more information requested, 9.7 km away
- Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along… — under wildlife review, 11 km away
- Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along… — lapsed, 11 km away
- 4G Saturation project — in-principle approval, conditions pending, 11.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.