Quick answers
What is this project?
Diversion Of 0.1072 Ha of Forest Land for Laying of Optical Fiber Cable along the Road Within the Existing Row in Aswraopally-II, Machupad and Tatikonda RF of Jangoan District, Telangana State is a proposed telecom project in Ashwaraopalli, Ragunathpally, Jangoan, Telangana. It seeks 0.3 acres of forest land.
Who is building it?
The applicant is Telangana Fiber Grid Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Ashwaraopalli, Ragunathpally, Jangoan, Telangana.
How big is it?
It has a stated cost of ₹46 lakh and 1,070 m² of forest land.
When was it filed?
The application was filed on 19 Feb 2023.
Project details
| Official title | Diversion Of 0.1072 Ha of Forest Land for Laying of Optical Fiber Cable along the Road Within the Existing Row in Forest Land in Aswraopally-II, Machupad and Tatikonda RF of Jangoan District, Telangana State. |
|---|---|
| Status | Initial checks |
| Status since | 19 Feb 2023 |
| Application filed | 19 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Telangana Fiber Grid Corporation Limited |
| Forest land | 1,070 m² |
| Project cost | ₹46 lakh |
| Village / locality | Ashwaraopalli |
| Taluk / tehsil | Ragunathpally |
| District | Jangoan |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04207 |
In context
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ashwaraopalli, Ragunathpally, Jangoan, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Rounith Rao Malyala-Gravel quarry - 1.214 ha -Production @ 50550 m3/Year — environmental approval granted, 3 km away
- Sri. Gugulothu Sri Ramulu - Opencast semi mechanized method of quarrying for… — environmental approval granted, 3.6 km away
- M/s. Smt. Kunduru Usha Reddy, Mining of Gravel over an extent of 1.22 Ha. in… — environmental approval granted, 4.4 km away
- Mining project by M/s. R.K. Stone Crusher - 2.00 Ha — environmental approval granted, 4.5 km away
- Mining project by M/s. R.K. Stone Crusher - 2.00 Ha — environmental approval granted, 4.5 km away
- M/s. Smt. Venumuddala Ramadevi, Mining of Gravel over an extent of 1.62 Ha. in… — lapsed, 4.6 km away
- Proposed Common Biomedical Waste Treatment Facility by M/s Mahe Enterprises — lapsed, 6.2 km away
- Sri. Arundathi Stone Crusher, Building Stone and Road Metal Mine, 7.0 Ha,… — environmental approval granted, 6.5 km away
All 79 Telangana Fiber Grid Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.